Subsidized Sale Flats Development at Ma On Shan Road and Public Rental Housing Development at Hang Tai Road, Ma On Shan Road Area 86B Phase 1 - Foundation and Site Formation Works
(2018 – Work in Progress)
Hong Kong Housing Authority
2018 – Work in Progress
This Project consists of 2 areas
1) Subsidized Sale Flats Development at Ma On Shan Road
2) Public Rental Housing Development at Hang Tai Road
Ho Man Tin Station Package One Property Development at KIL11264, Ho Man Tin, Kowloon - Site Formation, Foundation, ELS and Drainage Diversion Works
(2018 –Work in Progress)
Gold Brilliant Investment Limited
2018 –Work in Progress
Project highlights:
Sky Bridge Connecting Terminal 1 with North Satellite Concourse - Bored Piling Works
(2018 – 2019)
The Airport Authority Hong Kong
2018 – 2019
Public Rental Housing Development at Tuen Mun Area 54 Sites 1 & 1A and Demolition for Ex-HKCSC’s Association Cheung Chui Cheong Memorial Primary School at Cheung Ching Estate, Tsang Yi – Foundation Works
(2018-2019)
Hong Kong Housing Authority
2018 – 2019
This Project consists of 2 areas
1) Public Rental Housing located at TM54 Area 1 & 1A
2) Demolition for Ex-HKCSC’s Association Cheung Chui Cheong Memorial Primary School at Cheung Ching Estate, Tsang Yi
Public Rental Housing Development at Tai Po Area 9, Tai Po - Foundation, Site Formation, Roads and Drainage
(2017 – Work in Progress)
Hong Kong Housing Authority
2017 – Work in Progress
Tseung Kwan O – Lam Tin Tunnel Main Tunnel and Associated Works - Bored Pile Construction
(2017 – Work in Progress)
Civil Engineering and Development Department (CEDD) of HKSAR Government
2017-Work in Progress
Foundation Works consists of the following
Project highlights
The project is mainly to construct Land and Marine Bored Piles. Land Piles are at Lam Tin area and Marine Piles are at Tseung Kwan O area with difficulties highlighted below:
Public Rental Housing Development at Ex-Au Tau Departmental Quarters, Yuen Long – Foundation Works
( 2012-2013)
Hong Kong Housing Authority
2012 – 2013
The project consists of the construction of 57 nos. of bored piles of 2.5m diameter and pile caps for construction of 3 nos. domestic blocks, temporary access road and re-provision of a section of the public road. In order to maintain a “Green” environment, tree felling within site must be kept to a minimum.
Public Rental Housing Development at Shatin Area 52 Phase 3 & 4 (Contract No.: 20110020) – Foundation Works
(2011-2013)
Hong Kong Housing Authority
2011-2013
Tai Kong Po to Tse Uk Tsuen Tunnels - Construction of Diaphragm Walls
(2011-2012)
Mass Transit Railway Corporation
2011 -2012
This project is a part of the Express Rail Link – Tai Kong Po to Tse Uk Tsuen. The tunnels used diaphragm wall construction. A pre-stitching technique was adopted to remove underground obstructions and a hydraulic trench cutter was used for excavation. These techniques reduced the vibrations generated from traditional hammering methods and preserved the adjacent natural environment and avoided nuisance to residents.
Central-Wan Chai Bypass Tunnel (Causeway Bay Typhoon Shelter Section) - Diaphragm Walls at Ex-Wan Chai Public Cargo Working Area
(2011)
Highways Department, HKSAR Government
2011
The construction of Central-Wan Chai Bypass Tunnel (Causeway Bay Typhoon Shelter Section) comprised diaphragm walls, grouting, shear pins, and tie back construction. The site is located at the Ex-Wan Chai Public Cargo Working Area. The construction method adopted the combination of pre-grouting and bentonite slurry technique to stabilize the trench. Based on various underground conditions, the unique properties of slurry were mixed for excavation in order to ensure the diaphragm wall stabilities.