Building Construction

Housing Engineering

Institutional, Sports Centre and Park

  • Hong Kong Palace Museum
    (2019-Work in progress)
  • Fire Services Training School Cum Driving Training School at Tseung Kwan O
    (2012-2015)
  • Joint-User Complex at Bailey Street,
    To Kwa Wan Reclamation
    (2010-2013)
  • Sport Centre in Area 28A,
    Fanling / Sheung Shui
    (2008-2011)
  • Sun Yat Sen Memorial Park and
    Swimming Pool
    (2008-2011)
  • Sports Ground at Area 45, Tseung Kwan O
    (2006-2009)
  • Centre for Youth Development at
    Chai Wan, Hong Kong
    (2005-2008)
  • Hin Tin Public Swimming Pool Phase 2
    (2005-2007)
  • Hong Kong Disneyland Resort Fantasyland Attractions at Penny's Bay, Lantau Island
    (2003-2005)
  • Hong Kong Disneyland Resort - Space Mountain and Buzz Lightyear Attractions
    (2003-2005)
  • New Headquarter for EMSD at Kai Shing Street, Kai Tak, Kowloon
    (2002-2004)
  • Police Headquarters Phase 3 at
    Arsenal Street, Wan Chai
    (2000-2004)
  • Sports Centre at Pak Shek Kok
    (1999-2000)
  • UC H.K. Central Library at
    Moreton Terrace, Causeway Bay
    (1997-1999)
  • Sheung Shui Slaughterhouse in Area 2B
    (1997-2000)
  • Regional Council Heritage Museum
    (1996-1998)
  • Passenger Terminal Building,
    Chek Lap Kok International Airport
    (1995-1997)
  • Police Headquarters Phase 2 at
    Arsenal Street, Wan Chai
    (1993-1995)

Design & Build

  • Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories
    (2020-2020)
  • Lei Yue Mun Park and Holiday Village Emergency Virus Prevention Observation and Isolation Centre
    (2020-2020)
  • Design and Construction of CUHK
    Medical Centre at the CUHK
    (2016 – Work in Progress)
  • Design and Construction of Centre of Excellence Paediatrics at Kai Tak Development, Hong Kong
    (2013-2017)
  • Fire Services Training School Cum Driving Training School at Tseung Kwan O
    (2012-2015)
  • Student Hostels (Site 1) for The Chinese University of Hong Kong
    (2010-2013)
  • Departmental Quarters for Customs & Excise Department
    (2010-2013)
  • Junior Police Officer's Married Quarters at Area 44 Tuen Mun
    (2007-2010)
  • Renovation of Libraries, Phase 2
    (2007-2008)
  • Hin Tin Public Swimming Pool Phase 2
    (2005-2007)
  • Sheung Shui Slaughterhouse in Area 2B
    (1997-2000)
  • Disciplined Services Married Quarters at Ngau Chi Wan
    (1995-1996)
  • China Overseas Building
    (1990-1991)

Hospital

  • Redevelopment of Kwong Wah Hospital Phase 1
    (2019-Work in Progress)
  • Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories
    (2020-2020)
  • Lei Yue Mun Park and Holiday Village Emergency Virus Prevention Observation and Isolation Centre
    (2020-2020)
  • Design and Construction of CUHK
    Medical Centre at the CUHK
    (2016 – Work in Progress)
  • Design and Construction of Centre of Excellence Paediatrics at Kai Tak Development, Hong Kong
    (2013-2017)
  • Block B for St. Paul's Hospital Redevelopment
    (2013-2016)
  • A New Infectious Disease Centre at Princes
    Margaret Hospital
    (2005-2006)
  • Fanling Primary Health Care Centre
    (2000-2002)
  • Kowloon Hospital Phase 1 Redevelopment
    (1999-2002)
  • Lai King Hospital
    (1998-2000)
  • New Operating Theatre Block at
    Queen Elizabeth Hospital
    (1997-1998)
  • Construction of the Hospital Authority Building at Argyle Street, Kowloon
    (1996-1997)
  • Tai Po Convalescent & Infirmary Hospital
    (1994-1997)
  • HKJC Institute of Radiology & Oncology at Queen Elizabeth Hospital
    (1994-1996)
  • Castle Peak Hospital
    Redevelopment Phase 1
    (1994-1996)
  • Ophthalmic Centre, Argyle Street, Kowloon
    (1989-1991)
  • Queen Elizabeth Hospital
    Block B Extension
    (1988-1991)

Educational Projects

  • The Student Amenity Centre at The Chinese University of Hong Kong
    (2011-2012)
  • Student Hostels (Site 1) for The Chinese University of Hong Kong
    (2010-2013)
  • The Hong Kong Polytechnic University - Phase 8 Development
    (2010-2013)
  • New Academic Building and Residential Accommodation for the Institute for Advanced Study for The Hong Kong University of Science and Technology
    (2009-2013)
  • Shek Mun Campus for School of Continuing Education of The Hong Kong Baptist University at Shatin
    (2004-2006)
  • A Purpose-Designed Building for Centralized Science Laboratories at The CUHK
    (2004-2006)
  • Through-Train Schools at Tseung Kwan O, Area 65 (Evangel College)
    (2004-2006)
  • New Campus Development (Community College) of Lingnan University
    (2003-2005)
  • CUHK Engineering Building Complex Phase II
    (2002-2003)
  • Conversion & Extension to Existing Schools Group 3 under School Improvement Programme
    (2001-2003)
  • City University of Hong Kong Student Hostels Phase 1
    (2000-2003)
  • Hong Kong Institute of Biotechnology Complex Phase 1
    (1990-1991)

Hotel and Shopping Mall

  • MGM Cotai Project for MGM Grand Paradise
    (2014-2018)
  • The Emperor Hotel Development at Wanchai
    (2014-2018)
  • Yau Tong Phase 4 Shopping Center
    (2009-2012)
  • City of Dreams Development
    (2006-2009)
  • MegaBox at Enterprise Square 5 NKIL 5927 Kowloon Bay
    (2005-2007)
  • Citywalk at TWT 398 Tai Ho Road
    (2004-2007)
  • Wynn Resorts Macau at Rua Cidada De Sintra, Macau
    (2004-2006)
  • Hong Kong Disneyland Hotel at
    Penny's Bay, Lantau Island
    (2003-2005)
  • Horizon Suite Hotel
    Development at STTL 461
    Ma On Shan
    (2000-2002)
  • Metropark Hotel Development at Tung Lo Wan Road
    (1999-2001)
  • Choi Ming Shopping Centre at Tseung Kwan O
    (1999-2001)
  • South Pacific Hotel
    (1990-1992)

Offices, Factory and Logistics Centre

  • Logistics Centre Development at Tsing Yi Town Lot No. 181
    (2015-2017)
  • Chinachem Central One and Two
    (2014-2017)
  • Commercial Development at
    38 Wong Chuk Hang
    (38 Southside)
    (2014-2017)
  • One Midtown at Hoi Shing Road,
    Tsuen Wan
    (2010-2012)
  • One Island South at 2 Heung Yip Road, Wong Chuk Hang
    (2008-2011)
  • Asia Aluminum Industrial City , Zhaoqing, Guangdong Province
    (2007-2008)
  • Commercial Building at
    196-206 Queen's Road East
    (2006-2007)
  • Asia Airfreight Terminal Expansion
    (2004-2007)
  • Hong Kong Movie City at Tseung Kwan O
    (2003-2005)
  • Science Park Building 6 at Pak Shek Kok Phase 1c
    (2002-2004)
  • Skyline Tower Commercial Development at Kowloon Bay
    (2002-2003)
  • Science Park Building 4 at Pak Shek Kok Phase 1b
    (2001-2003)
  • Hoi On Centre
    (1994-1995)
  • Union Plaza
    (1992-1994)
  • Kennedy Town Centre
    (1992-1994)
  • China Overseas Building
    (1990-1991)

Private Residential

  • The REGENT - Residential Development at Tai Po Town
    (2017-Work in Progress)
  • MONTARA - Composite Development at Lohas Park Package
    (2017 – Work in Progress)
  • Le PONT - Residential and Kindergarten
    Development at So Kwun Wat Road,
    Tuen Mun
    (2017 – Work in Progress)
  • SOLCITY - Property Development at West Rail Long Ping Station (South)
    (2017 – Work in Progress)
  • NAPA - Residential Development at So Kwun Wat Road, Tuen Mun
    (2015-2017)
  • ONE KAI TAK - Residential Development at Kai Tak
    (2015-2017)
  • The BLOOMSWAY - Residential Development at So Kwun Wat, Tuen Mun
    (2014-2017)
  • MAY FAIR BY THE SEA - Residential Development at Pak Shek Kok
    (2013-2015)
  • GRAND AUSTIN - Residential Development at Austin Station
    (2012-2015)
  • THE AVENUE – Residential Development at Lee Tung Stree, Wanchai
    (2011-2015)
  • THE GREEN – Residential Development at Fan Kam Rd
    2010-2013
  • FESTIVAL CITY Phase 1 at Tai Wai Maintenance Centre Phase 1
    (2007-2010)
  • LAKE SILVER at Ma On Shan
    (2007-2009)
  • VISION CITY – Residential Development at TWT 398 Tsuen Wan
    (2004-2007)
  • MOUNT BEACON – Residential Development at Cornwall Street
    (2004-2006)
  • ONE SILVER SEA - Commercial and Residential Development at Hoi Fai Road
    (2003-2006)
  • RESIDENCE OASIS - Hang Hau Commercial & Residential Development
    (2003-2005)
  • REGALIA BAY - Residential Development at R.B.L. 1138 Stanley
    (2001-2004)
  • NERINE COVE - Residential Development at Tuen Mun
    (1998-2000)

Public Housing

  • ON TAI ESTATE Block 10 and 11 at Anderson Road
    (2014-2017)
  • SHEUNG CHUI COURT at Tsuen Wan and CHING CHUN COURT at Tsing Yi
    (2014-2017)
  • SHUI CHUEN O ESTATE at Sha Tin
    (2011-2016)
  • Public Rental Housing Development at Kai Tak Site 1A Phases 1 and 2
    (2010-2013)
  • Choi Wan Road Site 2 Phase (Non-Domestic Portion), Site 3A and District Open Space Site A
    (2008-2011)
  • HOI LAI ESTATE - North Part of West Kowloon Reclamation Site
    (2002-2007)
  • Redevelopment of Kwai Chung Estate Phase 4
    (2001-2005)
  • TIN YAN ESTATE - Tin Shui Wai Area 101 Phase 2
    (2001-2004)
  • Redevelopment of Upper Ngau Tau Kok Phase1
    (2000-2002)
  • Redevelopment of Upper Wong Tai Sin Estate Phase 1
    (1998-2000)
  • Redevelopment of Shek Yam Estate
    Phase 2 at Tsuen Wan
    (1997-2000)
  • TIN SHING COURT - Tin Shui Wai
    (1997-1999)
  • TIN CHUNG COURT - Tin Shui Wai
    (1997-1999)
  • Redevelopment of Hing Wah Estate - Phase I
    (1996-1999)
  • Redevelopment of Tsui Ping Estate Phases 4, 6 & 8
    (1987-1996)
  • Redevelopment of Siu Sai Wan Estate, Phase 2
    (1987-1993)
  • Redevelopment of Lei Tung Estate,
    Phase 1
    (1984-1986)
  • Redevelopment of Tai Wo Hau Estate.
    Phase 2
    (1982-1984)
X

Hong Kong Palace Museum
(2019-Work in progress)

  • Project

    Hong Kong Palace Museum
    (2019-Work in progress)

    Client

    West Kowloon Cultural District Authority

    Construction Period

    2019-Work in progress

  • Scope of Works
      • Construction of a 7-storey high museum, of building height around 52 meters, including exhibition area, educational room, lecture theatre, souvenir shop and canteen, a podium garden, and other facilities, including the construction of 44 nos. of minipiles.
      • External wall mainly is fair face concrete.
      • One-level basement for machine room.The site area is about 17,447 square meters.
      • CFA is about 43,568 square meters.
....更多資料

Fire Services Training School Cum Driving Training School at Tseung Kwan O
(2012-2015)

  • Project

    Fire Services Training School Cum Driving Training School at Pak Shing Kok, Area 78, Tseung Kwan O
    (2012-2015)

    Client

    Architectural Services Department

    Construction Period

    2012-2015

  • Scope of Works
      • Design and construction of a fire fighting training school and driver training schools, 14 simulating fire model, with 8 tower blocks of 4 to 6-storeys high dormitories and academic buildings, including building services, external works, roads and drainage, slope of rock and soil, landscape and maintenance works.
      • The site area is about 161,000 square meters.
      • CFA is about 61,500 square meters.
....更多資料

Joint-User Complex at Bailey Street,
To Kwa Wan Reclamation
(2010-2013)

  • Project

    Construction of a Joint-User Complex at Bailey Street, To Kwa Wan Reclamation
    (2010-2013)

    Client

    Architectural Services Department

    Construction Period

    2010-2013

  • Scope of Works
      • Construction of a 10-storey high building consisting of multipurpose community halls with 450 seats, office facilities and dental clinic.
      • CFA is about 14,646 square meters.
....更多資料

Sport Centre in Area 28A,
Fanling / Sheung Shui
(2008-2011)

  • Project

    Sport Centre in Area 28A, Fanling / Sheung Shui
    (2008-2011)

    Client

    Architectural Services Department

    Construction Period

    2008-2011

  • Scope of Works
      • Construction of a 3-storeys high sports complex and facility, made up of metal roof and steel structures, with accommodation of 1,200 people, 180m runway, fitness room, children's playroom, table tennis room and a dance room, and other facilities, including design and construction of foundation works.
      • The site area is about 7,800 square meters.
      • CFA is about 8,975 square meters.
....更多資料

Sun Yat Sen Memorial Park and
Swimming Pool
(2008-2011)

  • Project

    Sun Yat Sen Memorial Park and Swimming Pool
    (2008-2011)

    Client

    Architectural Services Department

    Construction Period

    2008-2011

  • Scope of Works
      • Construction of Sun Yat Sen memorial park and a 3-storey high swimming pool complex including design and construction of the piled foundation system together with pile caps and strap beams for the building.
      • The site area is about 56,000 square meters.
      • CFA is about 14,200 square meters.
....更多資料

Sports Ground at Area 45, Tseung Kwan O
(2006-2009)

  • Project

    Sports Ground at Area 45, Tseung Kwan O
    (2006-2009)

    Client

    Architectural Services Department

    Construction Period

    2006-2009

  • Scope of Works
      • Design and construction of a main sports ground with track and field facilities conforming to the International Association of Athletics Federations (IAAF) standards. It comprises an 8-lane 400-meters all-weather synthetic running track; a warm-up track; an 11-a-side & 7-a-side natural turf football pitch; a covered spectator stand with a capacity of approximately 3,500 seats and a temporary removable spectator stands for approximately 1,500 seats.
      • CFA is about 2,346 square meters.
....更多資料

Centre for Youth Development at
Chai Wan, Hong Kong
(2005-2008)

  • Project

    Centre for Youth Development at Chai Wan, Hong Kong
    (2005-2008)

    Client

    Architectural Services Department

    Construction Period

    2005-2008

  • Scope of Works
      • Construction of a 12-storeys high building complex and a youth hostel (about 50 meters high) including curtain wall, fitting out, BS installation, and design and construction of a temporary protection screen for MTR viaduct.
      • The site area is about 5,300 square meters.
      • CFA is about 42,980 square meters.
....更多資料

Hin Tin Public Swimming Pool Phase 2
(2005-2007)

  • Project

    Hin Tin Public Swimming Pool Phase 2
    (2005-2007)

    Client

    Architectural Services Department

    Construction Period

    2005-2007

  • Scope of Works
      • Design and construction of an 8-lane, 50 meters indoor heated swimming pool.
      • Upgrading, conversion and renovation of existing swimming pool and construction of an AMS office.
      • The site area is about 11,290 square meters.
      • CFA is about 3,340 square meters.
....更多資料

Hong Kong Disneyland Resort Fantasyland Attractions at Penny's Bay, Lantau Island
(2003-2005)

  • Project

    Hong Kong Disneyland Resort Fantasyland Attractions at Penny's Bay, Lantau Island
    (2003-2005)

    Client

    Hong Kong Disneyland Management Ltd.

    Construction Period

    2003-2005

  • Scope of Works
      • Construction of the Fantasyland Attractions consisted of sub-structure and super-structure works to Cinderella's carousel, Mad Hatter's Teacups, Dumbo Flying Elephant, Meet and Greet and Train Station, Sleeping Beauty's Castle, Fantasyland Cafe, Winnie-the Pooh, Princess Shop, Fantasy Fare Restaurant and 3D Mickey's Philharmagic.
      • The site area is approximately 45,920 square meters.
....更多資料

Hong Kong Disneyland Resort - Space Mountain and Buzz Lightyear Attractions
(2003-2005)

  • Project

    Hong Kong Disneyland Resort - Space Mountain and Buzz Lightyear Attractions in Tomorrowland at Penny's Bay, Lantau Island
    (2003-2005)

    Client

    Hong Kong Disneyland Management Ltd.

    Construction Period

    2003-2005

  • Scope of Works
      • Construction of superstructure works, including interior fitting out, electrical and mechanical installation and roller coaster rides installation for the Space Mountain attraction in Tomorrowland.
      • The site area is about 5,730 square meters.
....更多資料

New Headquarter for EMSD at Kai Shing Street, Kai Tak, Kowloon
(2002-2004)

  • Project

    New Headquarter for EMSD at Kai Shing Street, Kai Tak, Kowloon
    (2002-2004)

    Client

    Architectural Services Department

    Construction Period

    2002-2004

  • Scope of Works
      • Conversion of an existing building into an 8-storey high headquarters with offices and vehicle workshops.
      • Construction of new passenger lift shafts and one additional office floor of approximately of 12,000 square meters. The roof was installed with integrated photovoltaic panels, and a footbridge was constructed to connect it to the International Trademart and the New EMSD Headquarters.
      • CFA is about 104,100 square meters.
....更多資料

Police Headquarters Phase 3 at
Arsenal Street, Wan Chai
(2000-2004)

  • Project

    Police Headquarters Phase 3 at Arsenal Street, Wan Chai
    (2000-2004)

    Client

    Architectural Services Department

    Construction Period

    2000-2004

  • Scope of Works
      • Design and construction of the foundation, diaphragm wall, four-level basement & drainage system.
      • Construction of a 43-storey high police headquarters complex including all fitting out and building services installation works.
      • CFA is about 139,000 square meters.
....更多資料

Sports Centre at Pak Shek Kok
(1999-2000)

  • Project

    Sports Centre at Pak Shek Kok, Tai Po Area 39, TPTL 170
    (1999-2000)

    Client

    Architectural Services Department

    Construction Period

    1999-2000

  • Scope of Works
      • Construction of a 3-storey high grandstand building, consisting of the following facilities;
      • a 400 meters eight-lane synthetic surface athletic track;
      • a soccer pitch in natural grass within the athletic track;
      • a synthetic grass soccer/hockey pitch;
      • a warm up track with synthetic surfacing;
      • five tennis courts; areas for outfield activities such as javelin, discus and shot put and associated external works.
....更多資料

UC H.K. Central Library at
Moreton Terrace, Causeway Bay
(1997-1999)

  • Project

    UC H.K. Central Library at Moreton Terrace, Causeway Bay
    (1997-1999)

    Client

    Architectural Services Department

    Construction Period

    1997-1999

  • Scope of Works
      • Construction of a 12-Storey high library building consisting of exhibition galleries, lecture theatre, activities rooms, reading rooms, bookshop, library offices, libraries and associated supporting services installations works.
      • CFA is about 32,400 square meters.
....更多資料

Sheung Shui Slaughterhouse in Area 2B
(1997-2000)

  • Project

    Sheung Shui Slaughterhouse in Area 2B
    (1997-2000)

    Client

    Architectural Services Department

    Construction Period

    1997-2000

  • Scope of Works
      • Design, construction and commissioning of a new slaughterhouse on a site in Area 2B at Sheung Shui.
      • The slaughterhouse was designed to have a slaughtering capacity of 5,000 pigs and 400 cattle and a maximum of 300 goats per day.
      • The site area is about 57,839 square meters.
      • CFA is about 77,000 square meters.
....更多資料

Regional Council Heritage Museum
(1996-1998)

  • Project

    Regional Council Heritage Museum
    (1996-1998)

    Client

    Architectural Services Department

    Construction Period

    1996-1998

  • Scope of Works
      • Construction of a 6-storey high exhibition complex together with associated external and landscaping works.
      • The site area is about 18,500 square meters.
      • CFA is about 31,000 square meters.
....更多資料

Passenger Terminal Building,
Chek Lap Kok International Airport
(1995-1997)

  • Project

    Passenger Terminal Building, Chek Lap Kok International Airport
    (1995-1997)

    Client

    Airport Authority Hong Kong

    Construction Period

    1995-1997

  • Scope of Works
      • Construction of the whole block of the Y-type main building of the airport passenger terminal building, including: Passenger handling building, eastern lobby, western lobby, north-south terminal, central terminal, northwest terminal and southwest terminal main structure, lift groove, staircase and other works;
      • Construction of roof cladding with structural steel supports, surface coverings, glass curtain walls, exterior metal and glazing, fixed connection channels, boarding gates and passenger automatic transportation systems.
      • The project was named as one of the top ten buildings in the world in the 20th century era by an international authority.
      • CFA is about 490,000 square meters.
....更多資料

Police Headquarters Phase 2 at
Arsenal Street, Wan Chai
(1993-1995)

  • Project

    Police Headquarters Phase 2 at Arsenal Street, Wan Chai
    (1993-1995)

    Client

    Architectural Services Department

    Construction Period

    1993-1995

  • Scope of Works
      • Construction of a 33-storey high complex with 1,560 rooms with various types of functions.
      • The site area is about 2,200 square meters.
      • CFA is about 47,720 square meters.
....更多資料

Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories
(2020-2020)

  • Project

    Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories
    (2020-2020)

    Client

    Architectural Services Department, Hong Kong Government

    Construction Period

    2020-2020

  • Scope of Works
      • Design and Build Project, based on previous experience, only 12 days after optimization to complete the project design, providing 700 units and 1400 beds
      • By using mic, the degree of prefabrication is higher and the degree of integration is as high as 90%
      • The greening coverage rate reaches 37%, and the diversified plants create a livable environment
      • It covers an area of about 53,000 square meters
      • The total construction area is 13,158 square meters
....更多資料

Lei Yue Mun Park and Holiday Village Emergency Virus Prevention Observation and Isolation Centre
(2020-2020)

  • Project

    Lei Yue Mun Park and Holiday Village Emergency Virus Prevention Observation and Isolation Centre
    (2020-2020)

    Client

    Architectural Services Department, Hong Kong Government

    Construction Period

    2020-2020

  • Scope of Works
      • Design and Build Project, The first virus prevention and isolation centre in Hong Kong
      • Use Modular Integrated Construction (MiC), Provide 352 units, 366 beds
      • Completed the first phase construction only used 600 hours
      • It covers an area of about 53,000 square meters
      • The total construction area is 6,239 square meters
      • It covers an area of about 15,122 square meters
....更多資料

Design and Construction of CUHK
Medical Centre at the CUHK
(2016 – Work in Progress)

  • Project

    Design and Construction of CUHK Medical Centre at the Chinese University of Hong Kong
    (2016 – Work in Progress)

    Client

    CUHK Medical Centre Ltd.

    Construction Period

    2016 – Work in Progress

  • Scope of Works
      • Design and construction of a 12-storey high Private Teaching Hospital Building including site preparation, pipe foundation, drainage installation and external road works.
      • The hospital provides a total of 516 beds.
      • The site area is about 13,737 square meters.
      • CFA is about 103,228 square meters.
....更多資料

Design and Construction of Centre of Excellence Paediatrics at Kai Tak Development, Hong Kong
(2013-2017)

  • Project

    Design and Construction of Centre of Excellence Paediatrics at Kai Tak Development, Hong Kong
    (2013-2017)

    Client

    Hospital Authority

    Construction Period

    2013-2017

  • Scope of Works
      • Design and construction of two 11-storey hospital blocks with a basement structure for carpark spaces and other ancillary facilities for the Hospital Authority. The works included site formation, pile foundations and basement structure, covered link bridges and interior fitting–out works.
      • The hospital provides a total of 468 beds.
      • The site area is about 21,685 square meters.
      • CFA is about 179,223 square meters.
....更多資料

Fire Services Training School Cum Driving Training School at Tseung Kwan O
(2012-2015)

  • Project

    Fire Services Training School Cum Driving Training School at Pak Shing Kok, Area 78, Tseung Kwan O
    (2012-2015)

    Client

    Architectural Services Department

    Construction Period

    2012-2015

  • Scope of Works
      • Design and construction of a fire fighting training school and driver training schools, 14 simulating fire model, with 8 tower blocks of 4 to 6-storeys high dormitories and academic buildings, including building services, external works, roads and drainage, slope of rock and soil, landscape and maintenance works.
      • The site area is about 161,000 square meters.
      • CFA is about 61,500 square meters.
....更多資料

Student Hostels (Site 1) for The Chinese University of Hong Kong
(2010-2013)

  • Project

    Student Hostels (Site 1) for The Chinese University of Hong Kong
    (2010-2013)

    Client

    Chinese University of Hong Kong

    Construction Period

    2010-2013

  • Scope of Works
      • Design and construction of 2 tower blocks with 300-Place Student Hostel in each block, comprising of a basement carpark and pumping stations; a 5-storeys high building as the student activities center, including studios, exhibition hall, cafe, multi-purpose hall, fairgrounds, music rooms and lounges.
      • The site area is about 6,800 square meters
      • CFA is about 14,665 square meters.
....更多資料

Departmental Quarters for Customs & Excise Department
(2010-2013)

  • Project

    Departmental Quarters for Customs & Excise Department
    (2010-2013)

    Client

    Architectural Services Department

    Construction Period

    2010-2013

  • Scope of Works
      • Design and construction of a 20-storeys high Government quarters buildings comprising 80 residential units on top of a 3-storeys carpark including, open green garden, clubhouse at the top level and plant rooms, and other facilities.
      • Foundation works consists of 110 nos. of H piles and 3,436 m long soldier piles.
      • The site area is 1,365 square meters.
      • CFA is about 11,968 square meters.
....更多資料

Junior Police Officer's Married Quarters at Area 44 Tuen Mun
(2007-2010)

  • Project

    Junior Police Officer's Married Quarters at Area 44 Tuen Mun
    (2007-2010)

    Client

    Architectural Services Department

    Construction Period

    2007-2010

  • Scope of Works
      • Design and construction of 2 tower blocks comprising a 22-storey high residential tower in each block of 84 nos. grade “F” and 252 nos. grade “G” quarters built on top of a 3-storey high podium completed with various ancillary facilities and landscaping areas, providing 91 nos. covered carpark spaces, 10 nos. motor cycle parking spaces; 1 no. loading & unloading bay and a children’s playground.
      • The development provides a total of 336 residential units.
      • The construction works included site preparation and piled foundations works.
      • The building was completed with basic interior fitting-out works, drainage and external works, and associated building, electrical and mechanical services installations.
      • The site area is about 4,700 square meters.
      • CFA is about 29,000 square meters.
....更多資料

Renovation of Libraries, Phase 2
(2007-2008)

  • Project

    Renovation of Libraries, Phase 2
    (2007-2008)

    Client

    Architectural Services Department

    Construction Period

    2007-2008

  • Scope of Works
      • Design and construction of6 existing libraries at Lockhart Road, Fa Yuen Street, Shui Wo Street, To Kwa Wan and Sha Tin to be redesigned and renovated in phases while maintaining normal operation. The refurbishment works consists of removal, addition, alteration, with the provision of reinforcement, decoration, electrical and mechanical installation, and other related works.
      • The site area is about 8,169 square meters.
....更多資料

Hin Tin Public Swimming Pool Phase 2
(2005-2007)

  • Project

    Hin Tin Public Swimming Pool Phase 2
    (2005-2007)

    Client

    Architectural Services Department

    Construction Period

    2005-2007

  • Scope of Works
      • Design and construction of an 8-lane, 50 meters indoor heated swimming pool.
      • Upgrading, conversion and renovation of existing swimming pool and construction of an AMS office.
      • The site area is about 11,290 square meters.
      • CFA is about 3,340 square meters.
....更多資料

Sheung Shui Slaughterhouse in Area 2B
(1997-2000)

  • Project

    Sheung Shui Slaughterhouse in Area 2B
    (1997-2000)

    Client

    Architectural Services Department

    Construction Period

    1997-2000

  • Scope of Works
      • Design, construction and commissioning of a new slaughterhouse on a site in Area 2B at Sheung Shui.
      • The slaughterhouse was designed to have a slaughtering capacity of 5,000 pigs and 400 cattle and a maximum of 300 goats per day.
      • The site area is about 57,839 square meters.
      • CFA is about 77,000 square meters.
....更多資料

Disciplined Services Married Quarters at Ngau Chi Wan
(1995-1996)

  • Project

    Disciplined Services Married Quarters at Ngau Chi Wan
    (1995-1996)

    Client

    Architectural Services Department

    Construction Period

    1995-1996

  • Scope of Works
      • Design and construction of three 32-storey tower blocks to provide 744 units of Disciplined Services Married Quarters all complete with services and amenities, clubrooms, squash court of an approximate gross floor area of 51,840 square meters and 186 covered carparks.
      • CFA is about 64,900 square meters.
....更多資料

China Overseas Building
(1990-1991)

  • Project

    China Overseas Building
    (1990-1991)

    Client

    China Overseas Land & Investment Ltd.

    Construction Period

    1990-1991

  • Scope of Works
      • Design and construction of foundation, 7 meters deep basement and a 30-storeys high luxury office tower building.
      • The site area is about 1,256 square meters.
      • CFA is about 20,930 square meters.
....更多資料

Redevelopment of Kwong Wah Hospital Phase 1
(2019-Work in Progress)

  • Project

    Redevelopment of Kwong Wah Hospital Phase 1
    (2019-Work in Progress)

    Client

    Hospital Authority

    Construction Period

    2019-Work in Progress

  • Scope of Works
      • Construction of a 19-storey high hospital building with a two-level deep basement and long span structural steel beams at 4th to 5th floor. The disinfection chamber at 2nd floor is being designed and built by the Company.
      • The hospital provides a total of 681 beds.
      • The construction works include preservation work to the existing Tung Wah Museum nearby and transplantation of 12 nos. of existing trees.
      • The site area is about 8,148 square meters.
      • CFA is about 146,000 square meters.
....更多資料

Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories
(2020-2020)

  • Project

    Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories
    (2020-2020)

    Client

    Architectural Services Department, Hong Kong Government

    Construction Period

    2020-2020

  • Scope of Works
      • Design and Build Project, based on previous experience, only 12 days after optimization to complete the project design, providing 700 units and 1400 beds
      • By using mic, the degree of prefabrication is higher and the degree of integration is as high as 90%
      • The greening coverage rate reaches 37%, and the diversified plants create a livable environment
      • It covers an area of about 53,000 square meters
      • The total construction area is 13,158 square meters
....更多資料

Lei Yue Mun Park and Holiday Village Emergency Virus Prevention Observation and Isolation Centre
(2020-2020)

  • Project

    Lei Yue Mun Park and Holiday Village Emergency Virus Prevention Observation and Isolation Centre
    (2020-2020)

    Client

    Architectural Services Department, Hong Kong Government

    Construction Period

    2020-2020

  • Scope of Works
      • Design and Build Project, The first virus prevention and isolation centre in Hong Kong
      • Use Modular Integrated Construction (MiC), Provide 352 units, 366 beds
      • Completed the first phase construction only used 600 hours
      • It covers an area of about 53,000 square meters
      • The total construction area is 6,239 square meters
      • It covers an area of about 15,122 square meters
....更多資料

Design and Construction of CUHK
Medical Centre at the CUHK
(2016 – Work in Progress)

  • Project

    Design and Construction of CUHK Medical Centre at the Chinese University of Hong Kong
    (2016 – Work in Progress)

    Client

    CUHK Medical Centre Ltd.

    Construction Period

    2016 – Work in Progress

  • Scope of Works
      • Design and construction of a 12-storey high Private Teaching Hospital Building including site preparation, pipe foundation, drainage installation and external road works.
      • The hospital provides a total of 516 beds.
      • The site area is about 13,737 square meters.
      • CFA is about 103,228 square meters.
....更多資料

Design and Construction of Centre of Excellence Paediatrics at Kai Tak Development, Hong Kong
(2013-2017)

  • Project

    Design and Construction of Centre of Excellence Paediatrics at Kai Tak Development, Hong Kong
    (2013-2017)

    Client

    Hospital Authority

    Construction Period

    2013-2017

  • Scope of Works
      • Design and construction of two 11-storey hospital blocks with a basement structure for carpark spaces and other ancillary facilities for the Hospital Authority. The works included site formation, pile foundations and basement structure, covered link bridges and interior fitting–out works.
      • The hospital provides a total of 468 beds.
      • The site area is about 21,685 square meters.
      • CFA is about 179,223 square meters.
....更多資料

Block B for St. Paul's Hospital Redevelopment
(2013-2016)

  • Project

    Block B for St. Paul's Hospital Redevelopment
    (2013-2016)

    Client

    St. Paul's Hospital

    Construction Period

    2013-2016

  • Scope of Works
      • Construction of a 24-storey high hospital building, including a 3-storey high carpark, library, computer room, consulting rooms complete with associated building services installation and medical and non-medical gases services.
      • The hospital provides 457-beds, and has device designed radiation proof material to 14 operating rooms, and specialist treatment rooms, specialist consultation rooms, glass curtain wall and aluminum curtain wall.
      • The site area is about 5,460 square meters.
      • CFA is about 64,130 square meters.
....更多資料

A New Infectious Disease Centre at Princes
Margaret Hospital
(2005-2006)

  • Project

    A New Infectious Disease Centre at Princes Margaret Hospital
    (2005-2006)

    Client

    Hospital Authority

    Construction Period

    2005-2006

  • Scope of Works
      • Construction of a 17-storey high hospital building, including foundations, 2 link bridges with associated building services, interfacing works, drainage and external works.
      • The hospital provides a total of 110 beds.
      • The site area is about 3,620 square meters.
      • CFA is about 21,600 square meters.
....更多資料

Fanling Primary Health Care Centre
(2000-2002)

  • Project

    Fanling Primary Health Care Centre
    (2000-2002)

    Client

    Hospital Authority

    Construction Period

    2000-2002

  • Scope of Works
      • Construction of a 9-storey high building for general out-patient clinic, integrated day treatment centre, child assessment centre, school dental clinic, material and child health centre and related supporting facilities, such as laboratories, lecture rooms, minor surgery and dispensary.
      • CFA is about 17,550 square meters.
....更多資料

Kowloon Hospital Phase 1 Redevelopment
(1999-2002)

  • Project

    Kowloon Hospital Phase 1 Redevelopment
    (1999-2002)

    Client

    Hospital Authority

    Construction Period

    1999-2002

  • Scope of Works
      • Construction of a 12-storey high hospital building with a single-storey building services unit, a 15 meters long fully enclosed suspended link bridge and installation of a new underground drainage system, new water supply system, external works, site formation and geotechnical works.
      • The hospital provides a total of 528 beds.
      • CFA is about 34,550 square meters.
....更多資料

Lai King Hospital
(1998-2000)

  • Project

    Lai King Hospital
    (1998-2000)

    Client

    Hospital Authority

    Construction Period

    1998-2000

  • Scope of Works
      • Construction of a 7-storey high hospital building, including physiotherapy and occupational therapy treatment centre, radiology, dispensary and medical data centre, electrical engineering facilities and associated drainage works, fencing, greenery and civil engineering works.
      • The hospital provides a total of 256 beds.
      • CFA is about 22,150 square meters.
....更多資料

New Operating Theatre Block at
Queen Elizabeth Hospital
(1997-1998)

  • Project

    New Operating Theatre Block at Queen Elizabeth Hospital
    (1997-1998)

    Client

    Hospital Authority

    Construction Period

    1997-1998

  • Scope of Works
      • Construction of a 7-storey high hospital building providing 22 operating theatres, health treatment department, recovery department, tutor rooms and meeting rooms. The construction works includes building services installation, underground pipelines, drainage, automated medical mover system, retaining walls and landscaping works.
      • The site area is about 2,300 square meters.
      • CFA is about 118,805 square meters.
....更多資料

Construction of the Hospital Authority Building at Argyle Street, Kowloon
(1996-1997)

  • Project

    Hospital Authority Building at Argyle Street, Kowloon
    (1996-1997)

    Client

    Hospital Authority

    Construction Period

    1996-1997

  • Scope of Works
      • Construction of a 7-storey high headquarters building with a single-level basement as the data base centre.
      • The building operates in an open-plan office layout with a rounded multi-functional conference room and a teaching theatre capable of housing over 100 audience members.
      • Other facilities included library, computer centre, exhibition hall, canteen and associated external works.
      • CFA is about 26,000 square meters.
....更多資料

Tai Po Convalescent & Infirmary Hospital
(1994-1997)

  • Project

    Tai Po Convalescent & Infirmary Hospital
    (1994-1997)

    Client

    Hospital Authority

    Construction Period

    1994-1997

  • Scope of Works
      • Construction of a 6-storey high convalescent hospital building complete with building services and hospital medical services works, and a 4-storey high office building.
      • The hospital provides a total of 1,020 beds.
      • The site area is about 42,886 square meters.
      • CFA is about 48,700 square meters.
....更多資料

HKJC Institute of Radiology & Oncology at Queen Elizabeth Hospital
(1994-1996)

  • Project

    HKJC Institute of Radiology & Oncology at Queen Elizabeth Hospital
    (1994-1996)

    Client

    Hospital Authority

    Construction Period

    1994-1996

  • Scope of Works
      • Construction of a 15-storey high building consisting of various hospital facilities and a 3-storey high New Building Services Unit.
      • The construction works also included renovation works to 3 existing buildings.
      • The site area is about 1,520 square meters.
      • CFA is about 1,514 square meters.
....更多資料

Castle Peak Hospital
Redevelopment Phase 1
(1994-1996)

  • Project

    Castle Peak Hospital Redevelopment Phase 1
    (1994-1996)

    Client

    Hospital Authority

    Construction Period

    1994-1996

  • Scope of Works
      • Construction of two 3-storey high ward buildings and associated external works.
      • The hospital provides a total of 752 beds.
      • The site area is about 18,880 square meters
      • CFA is about 21,890 square meters.
....更多資料

Ophthalmic Centre, Argyle Street, Kowloon
(1989-1991)

  • Project

    Ophthalmic Centre, Argyle Street, Kowloon
    (1989-1991)

    Client

    Hospital Authority

    Construction Period

    1989-1991

  • Scope of Works
      • Construction of a 5-storey high Ophthalmic Centre including pile caps at Argyle Street.
      • CFA is about 14,500 square meters.
....更多資料

Queen Elizabeth Hospital
Block B Extension
(1988-1991)

  • Project

    Queen Elizabeth Hospital, Block B Extension
    (1988-1991)

    Client

    Hospital Authority

    Construction Period

    1988-1991

  • Scope of Works
      • Construction of a 14-storey high Pathology building, a 4-storey high Building Services Block, and alteration to an existing lower floor of 4-storey high, and a new 7-storey extension on top of the existing hospital block.
      • CFA is about 23,766 square meters.
....更多資料

The Student Amenity Centre at The Chinese University of Hong Kong
(2011-2012)

  • Project

    The Student Amenity Centre at The Chinese University of Hong Kong
    (2011-2012)

    Client

    Chinese University of Hong Kong

    Construction Period

    2011-2012

  • Scope of Works
      • Construction of a basement carpark and pumping stations; a 5-storey high building as the student activities center, including studios, exhibition hall, cafe, multi-purpose hall, fairgrounds, music rooms and lounges.
      • The site area is about 3,900 square meters.
      • CFA is about 7,500 square meters.
....更多資料

Student Hostels (Site 1) for The Chinese University of Hong Kong
(2010-2013)

  • Project

    Student Hostels (Site 1) for The Chinese University of Hong Kong
    (2010-2013)

    Client

    Chinese University of Hong Kong

    Construction Period

    2010-2013

  • Scope of Works
      • Design and construction of 2 tower blocks with 300-Place Student Hostel in each block, comprising of a basement carpark and pumping stations; a 5-storeys high building as the student activities center, including studios, exhibition hall, cafe, multi-purpose hall, fairgrounds, music rooms and lounges.
      • The site area is about 6,800 square meters
      • CFA is about 14,665 square meters.
....更多資料

The Hong Kong Polytechnic University - Phase 8 Development
(2010-2013)

  • Project

    The Hong Kong Polytechnic University - Phase 8 Development
    (2010-2013)

    Client

    The Hong Kong Polytechnic University

    Construction Period

    2010-2013

  • Scope of Works
      • Construction of a 12-storeys high teaching facilities, a two-level basement, tunnel entrances and other areas, including interior fitting-out, mechanical and electrical installation and external works.
      • The site area is about 11,000 square meters.
      • CFA is about 54,650 square meters.
....更多資料

New Academic Building and Residential Accommodation for the Institute for Advanced Study for The Hong Kong University of Science and Technology
(2009-2013)

  • Project

    New Academic Building (NAB), Institute for Advanced Study (IAS) and Residential Accommodation for the Institute for Advanced Study (IASR) for The Hong Kong University of Science and Technology
    (2009-2013)

    Client

    Hong Kong University of Science and Technology

    Construction Period

    2009-2013

  • Scope of Works
      • Construction of a new school building for preschool placement and business students, including site formation, foundation and superstructure works. The NAB building is 8-storey high, the IAS building is 6-storey high and the IASR building is 9-storey high.
      • The site area is about 15,392 square meters.
      • CFA is about 35,591 square meters.
....更多資料

Shek Mun Campus for School of Continuing Education of The Hong Kong Baptist University at Shatin
(2004-2006)

  • Project

    Shek Mun Campus for School of Continuing Education of The Hong Kong Baptist University at Shatin Town Lot 540, Area 11, Shek Mun, N.T.
    (2004-2006)

    Client

    Hong Kong Baptist University

    Construction Period

    2004-2006

  • Scope of Works
      • Construction of a 6-storey high podium comprising auditorium, swimming pool, gymnasium, library, cafeteria, carpark.
      • Construction of a 9-storey high tower block comprising classrooms, lecture theatres, laboratories, administration offices and plant rooms.
      • The site area is about 3,031 square meters.
      • CFA is about 29,476 square meters.
....更多資料

A Purpose-Designed Building for Centralized Science Laboratories at The CUHK
(2004-2006)

  • Project

    A Purpose-Designed Building for Centralized Science Laboratories at The Chinese University of Hong Kong
    (2004-2006)

    Client

    Chinese University of Hong Kong

    Construction Period

    2004-2006

  • Scope of Works
      • Construction of a 6-storey high tower block of a highly specialized laboratory building with a link-bridge and external works including driveways, emergency vehicle access, paving, landscape and other associated facilities.
      • The site area is about 3,900 square meters.
      • CFA is about 13,939 square meters.
....更多資料

Through-Train Schools at Tseung Kwan O, Area 65 (Evangel College)
(2004-2006)

  • Project

    Through-Train Schools at Tseung Kwan O, Area 65 (Evangel College)
    (2004-2006)

    Client

    Through-Train Schools

    Construction Period

    2004-2006

  • Scope of Works
      • Construction of a 7-storey high building comprising of 30 classrooms primary school and a 7-storey, high of 30 classrooms secondary school including foundations, mechanical and electrical installations and external works.
      • The site area is about 13,555 square meters.
      • CFA is about 22,765 square meters.
....更多資料

New Campus Development (Community College) of Lingnan University
(2003-2005)

  • Project

    New Campus Development (Community College) of Lingnan University, Tuen Mun TMTL 376
    (2003-2005)

    Client

    Lingnan University

    Construction Period

    2003-2005

  • Scope of Works
      • Construction of a 6-storey high Additional Academic Block, a chapel, a 2-storey high library extension on the roof of the existing Main Building, a 2-storey extension on the roof of the existing Amenities Building, a one-storey extension on the existing Administration Building, a one-storey Amenity Center at Site B, associated conversion works in the existing buildings and associated landscaping works
      • CFA is about 19,431 square meters.
....更多資料

CUHK Engineering Building Complex Phase II
(2002-2003)

  • Project

    CUHK Engineering Building Complex Phase II at The Chinese University of Hong Kong
    (2002-2003)

    Client

    Chinese University of Hong Kong

    Construction Period

    2002-2003

  • Scope of Works
      • Construction of a 10-storey high building and a dangerous goods store comprising of site formation, pile-caps and underground drainage.
      • CFA is about 10,159 square meters.
....更多資料

Conversion & Extension to Existing Schools Group 3 under School Improvement Programme
(2001-2003)

  • Project

    Conversion & Extension to Existing Schools Group 3 under School Improvement Programme Ph. IV Package 1
    (2001-2003)

    Client

    Architectural Services Department

    Construction Period

    2001-2003

  • Scope of Works
      • Conversion and extension to six existing schools comprising designed piled foundations, pile caps, and superstructures, including all associated supply, installation and testing of building services installations, site works and external works.
....更多資料

City University of Hong Kong Student Hostels Phase 1
(2000-2003)

  • Project

    City University of Hong Kong Student Hostels Phase 1
    (2000-2003)

    Client

    City University of Hong Kong

    Construction Period

    2000-2003

  • Scope of Works
      • Construction of 3 residential buildings, 12 storey, 13 storey and 16 storey high respectively.
      • Construction of a single-storey multi-purpose hall and a single-storey refuse collection centre.
      • The site area is about 20,500 square meters.
      • CFA is about 15,840 square meters.
....更多資料

Hong Kong Institute of Biotechnology Complex Phase 1
(1990-1991)

  • Project

    Hong Kong Institute of Biotechnology Complex Phase 1
    (1990-1991)

    Client

    Hong Kong Institute of Biotechnology

    Construction Period

    1990-1991

  • Scope of Works
      • Construction of a 6-storey high staff quarters building on piled foundations including external roads, drains and landscaping works.
      • CFA is about 8,900 square meters.
....更多資料

MGM Cotai Project for MGM Grand Paradise
(2014-2018)

  • Project

    MGM Cotai Project for MGM Grand Paradise
    (2014-2018)

    Client

    MGM Macau

    Construction Period

    2014-2018

  • Scope of Works
      • Construction of a 6-storey high luxury suite.
      • Construction of a hotel development comprising two tower blocks 30 to 36 storey high on top of a 5-storey high podium and a three-level basement carpark. The building construction includes a 3 meters thick transfer-plate and curtain wall installation.
      • The hotel towers provide a total of 1,557 guestrooms.
      • The site area is about 75,040 square meters.
      • CFA is about 438,456 square meters.
....更多資料

The Emperor Hotel Development at Wanchai
(2014-2018)

  • Project

    The Emperor Hotel Development at 373 Queen's Road East, Wanchai, Hong Kong
    (2014-2018)

    Client

    Emperor International Holdings Ltd.

    Construction Period

    2014-2018

  • Scope of Works
      • Construction of a 27-storey high hotel development with a two-level basement.
      • This is a four-star hotel with a total of 300 guestrooms and has a variety of leisure, food and parking facilities.
      • The site area is about 960 square meters.
      • CFA is about 14,915 square meters.
....更多資料

Yau Tong Phase 4 Shopping Center
(2009-2012)

  • Project

    Yau Tong Phase 4 Shopping Center
    (2009-2012)

    Client

    Hong Kong Housing Authority

    Construction Period

    2009-2012

  • Scope of Works
      • Construction of a 7-storey high shopping mall with carpark facilities, public transport interchanges, two community halls, two pedestrian bridges connecting to Lei Yue Mun Plaza.
      • The development includes alteration and upgrading of escalators, awnings, toilets, shelters, and demolition of a single-storey refuse station, pedestrian walkways, a single-storey shopping arcade with canopies.
      • The site area is about 14,920 square meters.
      • CFA is about 70,200 square meters.
....更多資料

City of Dreams Development
(2006-2009)

  • Project

    City of Dreams Development
    (2006-2009)

    Client

    Melco Hotel & Resort (Macau) Ltd.

    Construction Period

    2006-2009

  • Scope of Works
      • Construction of four luxury hotels, ranging from 28-storey to 34-storey, namely, six-star Crown Hotel, five-star Grand Hyatt and Hyatt Regency and four-star Hard Rock Hotel, with a building height of about 120 meters and a total of 1,588 guestrooms.
      • Construction of two tower blocks of 40-storey high serviced residential apartments with a building height of about 140 meters and a total of about 400 residential units.
      • In total, the hotel casino complex provides about 2,000 guestrooms and apartment units.
      • Construction of a theatre and a large platform with shops, restaurants, entertainment venues and carpark facilities
      • The Casinos and entertainment complex of about 40,000 square meters area is built under the platform pool and accommodates about 450 gaming tables and 3,000 slots machines.
      • The site area is about 110,000 square meters.
      • CFA is about 497,740 square meters.
....更多資料

MegaBox at Enterprise Square 5 NKIL 5927 Kowloon Bay
(2005-2007)

  • Project

    MegaBox at Enterprise Square 5 NKIL 5927 Kowloon Bay
    (2005-2007)

    Client

    MegaBox Development Company Ltd.

    Construction Period

    2005-2007

  • Scope of Works
      • Construction of a 19-storey high shopping mall and entertainment complex, including one basement and two office tower blocks 16 storey high built on top of the podium complex.
      • The podium floors are built for shops and carpark facilities, and the top level is used for operating as a high-end club and spa facilities.
      • The office development above the podium floor is used for high grade office accommodation.
      • To date, this development is one of the largest shopping centres ever constructed in Hong Kong.
      • The total building height is approximately 172 meters and used about 164,000 cubic meters of concrete in the structural frame construction.
      • The site area is about 12,200 square meters.
      • CFA is about 224,440 square meters.
....更多資料

Citywalk at TWT 398 Tai Ho Road
(2004-2007)

  • Project

    Citywalk at TWT 398 Tai Ho Road / Yeung Uk Road, Tsuen Wan
    (2004-2007)

    Client

    Sino Group and Urban Renewal Authority J.V.

    Construction Period

    2004-2007

  • Scope of Works
      • Citywalk is one of the largest shopping centres in Tsuen Wan, New Territories, Hong Kong.
      • It is located at Yeung Uk Road, beneath Vision City and opposite to Nina Tower, and is one of the tallest buildings in Hong Kong.
      • CFA is about 30,000 square meters.
....更多資料

Wynn Resorts Macau at Rua Cidada De Sintra, Macau
(2004-2006)

  • Project

    Wynn Resorts Macau at Rua Cidada De Sintra, Macau
    (2004-2006)

    Client

    Wynn Resorts (Macau) S.A.

    Construction Period

    2004-2006

  • Scope of Works
      • Design and construction of a Casino and a five-star hotel and entertainment complex comprising a low-rise podium with a steel roof structure and structural steel frame, a high-rise tower with a concrete frame and external curtain wall system.
      • The podium includes a Casino comprising a main gaming hall, a VIP gaming area, and private gaming rooms, restaurants, a retail arcade, multi-purpose hall, supporting offices and the back of house.
      • The tower comprising of a front of house, coffee shop, a spa center, supporting offices, meeting rooms, typical guestrooms, suites, penthouse apartments, and a VIP gaming area on the top floor of the building.
      • The hotel casino provides about 600 guestrooms.
      • The site area is about 65,178 square meters.
      • CFA is about 152,927 square meters.
....更多資料

Hong Kong Disneyland Hotel at
Penny's Bay, Lantau Island
(2003-2005)

  • Project

    Hong Kong Disneyland Hotel at Penny's Bay, Lantau Island
    (2003-2005)

    Client

    Walt Disney Imagineering Hong Kong

    Construction Period

    2003-2005

  • Scope of Works
      • Construction of superstructure and sub-structure works to the deluxe five-star hotel building. The hotel complex comprise outbuildings, swimming pool, extensive landscaping works and other facilities.
      • This hotel development has about 400 guestrooms.
      • The site area is about 73,960 square meters.
      • CFA is about 43,640 square meters..
....更多資料

Horizon Suite Hotel
Development at STTL 461
Ma On Shan
(2000-2002)

  • Project

    Horizon Suite Hotel Development at STTL 461 Ma On Shan
    (2000-2002)

    Client

    Cheung Kong (Holdings) Ltd.

    Construction Period

    2000-2002

  • Scope of Works
      • Construction of a 17-storey high hotel building comprising a single-level basement, a single-level podium with mezzanine floor and 14 upper-level hotel rooms.
      • The hotel building consists of about 831 guestrooms and other facilities and all associated building services works.
      • The site area is about 8,000 square meters.
      • CFA is about 66,073 square meters.
....更多資料

Metropark Hotel Development at Tung Lo Wan Road
(1999-2001)

  • Project

    Metropark Hotel Development at Tung Lo Wan Road
    (1999-2001)

    Client

    China Travel International Investment Hong Kong Limited

    Construction Period

    1999-2001

  • Scope of Works
      • Construction of a 31-storey high hotel tower providing 326 guestrooms on top of a 3-storey high podium with carparks, hotel front and back of house areas and all associated external and landscaping works.
      • CFA is about 16,987 square meters.
....更多資料

Choi Ming Shopping Centre at Tseung Kwan O
(1999-2001)

  • Project

    Choi Ming Shopping Centre at Tseung Kwan O Area 74 Phase 1
    (1999-2001)

    Client

    Hong Kong Housing Authority

    Construction Period

    1999-2001

  • Scope of Works
      • Construction of a 5-storey high non-standard commercial centre.
      • CFA is about 34,560 square meters.
....更多資料

South Pacific Hotel
(1990-1992)

  • Project

    South Pacific Hotel
    (1990-1992)

    Client

    Shanghai Industrial Investment Co., Ltd.

    Construction Period

    1990-1992

  • Scope of Works
      • Construction of a two-level basement and an elliptical shaped reinforced concrete multi-storey superstructure providing about 308 guestrooms.
      • The site area is about 980 square meters.
      • CFA is about 16,460 square meters.
....更多資料

Logistics Centre Development at Tsing Yi Town Lot No. 181
(2015-2017)

  • Project

    Logistics Centre Development at Tsing Yi Town Lot No. 181, NT.
    (2015-2017)

    Client

    Kongwell Logistics Limited

    Construction Period

    2015-2017

  • Scope of Works
      • Construction of a 14-storeys high logistics centre, comprising an 11-storey high warehouse with loading and unloading dock, a vehicular ramp, and a 3-storey high ancillary office above the warehouse floors and complete with building services and BMU installation works.
      • The site area is about 23,977 square meters.
      • CFA is about 169,787 square meters.
....更多資料

Chinachem Central One and Two
(2014-2017)

  • Project

    Chinachem Central One and Two
    (2014-2017)

    Client

    Chinachem Group

    Construction Period

    2014-2017

  • Scope of Works
      • Construction of a single-level- basement, a 28-storey high commercial building, made-up of retail shops from ground to 2nd floor, dining restaurants from 3rd to 8th floor and 14th floor, and from 9th to 13th floor and 15th to 25th floor for office usage.
      • The site area is about 1,066 square meters.
      • CFA is about 21,137 square meters.
....更多資料

Commercial Development at
38 Wong Chuk Hang
(38 Southside)
(2014-2017)

  • Project

    Commercial Development at 38 Wong Chuk Hang (38 Southside)
    (2014-2017)

    Client

    Wisefield Enterprises Ltd.

    Construction Period

    2014-2017

  • Scope of Works
      • Construction of a 26-storey high office building and a two-level basement.
      • The site area is about 1,013 square meters.
      • CFA is about 20,580 square meters.
....更多資料

One Midtown at Hoi Shing Road,
Tsuen Wan
(2010-2012)

  • Project

    One Midtown at Hoi Shing Road, TWIL 36, Tsuen Wan
    (2010-2012)

    Client

    Wharf Estates Development Ltd.

    Construction Period

    2010-2012

  • Scope of Works
      • Construction of a 36-storey high office building on top of a 4 -storey high carpark podium. The construction works are complete with electrical and mechanical installations, lifts, electrical equipment, air conditioning and fire protection systems, curtain walls, plumbing and drainage installation and external works; conversion of an existing power distribution room and removal of an existing concrete floor and lobby decoration.
      • CFA is about 71,545 square meters.
....更多資料

One Island South at 2 Heung Yip Road, Wong Chuk Hang
(2008-2011)

  • Project

    One Island South at 2 Heung Yip Road, Wong Chuk Hang
    (2008-2011)

    Client

    Wharf Estates Development Ltd.

    Construction Period

    2008-2011

  • Scope of Works
      • Construction of a 25-storey high commercial building including refuge floor at 9/F on top of a 4-storey high carport podium with loading and unloading areas, parking spaces, plant rooms and workshops, and other facilities.
      • CFA is about 82,200 square meters.
....更多資料

Asia Aluminum Industrial City , Zhaoqing, Guangdong Province
(2007-2008)

  • Project

    Asia Aluminum Industrial City in the New High-Tech Industrial Development Zone, Zhaoqing, Guangdong Province
    (2007-2008)

    Client

    Asia Aluminum Holdings Limited

    Construction Period

    2007-2008

  • Scope of Works
      • The Works is mainly divided into nine areas, constructed of prefabricated columns plus steel hanging beams and coloured steel plates, concrete bearing platform and other main structure for the elevated warehouse, and electromechanical devices and aluminum production equipment for the workshop.
      • Construction of 160,000 square meters pedestrian road, 121,738 square meters road and 212,000 square meters of outdoor greening works.
      • The maximum height of the building is about 41.68 meters.
      • The main building consists of casting workshop, hot rolling workshop, cold rolling workshop, elevated warehouse, finishing workshop, coating workshop, packaging and shipping workshop, medium and thick plate workshop, roll workshop and public auxiliary equipment building.
      • CFA is about 350,000 square meters.
....更多資料

Commercial Building at
196-206 Queen's Road East
(2006-2007)

  • Project

    Commercial Building at 196-206 Queen's Road East
    (2006-2007)

    Client

    Hopewell Group

    Construction Period

    2006-2007

  • Scope of Works
      • Construction of a 25-storey high reinforced concrete commercial tower with a 3-storey high podium and a 22-storey high typical office floors, a new footbridge linking to an existing footbridge system abutting “Hopewell Centre” and the site, and including all associated underground and above ground building services.
      • The site area is about 464 square meters.
      • CFA is about 7,156 square meters.
....更多資料

Asia Airfreight Terminal Expansion
(2004-2007)

  • Project

    Asia Airfreight Terminal Expansion
    (2004-2007)

    Client

    Asia Airfreight Terminal Co., Ltd.

    Construction Period

    2004-2007

  • Scope of Works
      • Construction of a 4-storey high warehouse, an 8-storey high office tower and a new link-bridge including foundation, landscaping, road widening and other associated facilities.
      • The Material Handling and Cargo Management Systems are complicated, advanced and unique, exceptional to the normal E&M installations.
      • The site area is about 42,400 square meters.
      • CFA is about 117,476 square meters.
....更多資料

Hong Kong Movie City at Tseung Kwan O
(2003-2005)

  • Project

    Hong Kong Movie City at Tseung Kwan O Area 106, TL67 & 81, Sai Kung, N.T.
    (2003-2005)

    Client

    The Hong Kong Movie City Company Ltd.

    Construction Period

    2003-2005

  • Scope of Works
      • Construction of a 3-storey high post-production centre, a 6-storey high administration building, a 5-storey high logistics building, five studio blocks, and a 3-storey high theatre building. A consortium led by Shaw Brothers developed this project and the facilities is estimated for the production of up to 70 movies each year.
      • Total investment is approximately HK$1 billion.
      • The site area is about 48,600 square meters.
      • CFA is about 85,100 square meters.
....更多資料

Science Park Building 6 at Pak Shek Kok Phase 1c
(2002-2004)

  • Project

    Science Park Building 6 at Pak Shek Kok Phase 1c, Sha Tin
    (2002-2004)

    Client

    Architectural Services Department

    Construction Period

    2002-2004

  • Scope of Works
      • Construction of an 8-storey high office building for research, development and precision engineering activities with a single-level basement (structure completed by others) for carparks, plant rooms and services tunnel.
      • The site area is about 13,300 square meters.
      • CFA is about 28,800 square meters.
....更多資料

Skyline Tower Commercial Development at Kowloon Bay
(2002-2003)

  • Project

    Skyline Tower Commercial Development at NKIL 5846 12 Kai Shun Road Kowloon Bay
    (2002-2003)

    Client

    Sino Group

    Construction Period

    2002-2003

  • Scope of Works
      • Construction of a 39-storey high commercial building, with an 8-storey high carpark and a new link bridge to connect the building and carpark.
      • The site area is about 6,511 square meters.
      • CFA is about 77,806 square meters.
....更多資料

Science Park Building 4 at Pak Shek Kok Phase 1b
(2001-2003)

  • Project

    Science Park Building 4 at Pak Shek Kok Phase 1b
    (2001-2003)

    Client

    Architectural Services Department

    Construction Period

    2001-2003

  • Scope of Works
      • Construction of two 7-storey high office buildings for research and development activities with a common basement for carpark and plant rooms, and a services tunnel linking the adjoining buildings.
      • The site area is about 138,800 square meters.
      • CFA is about 40,010 square meters.
....更多資料

Hoi On Centre
(1994-1995)

  • Project

    Hoi On Centre at Nos 83-91 Nam On Street, Hong Kong
    (1994-1995)

    Client

    Alfa Million Development Ltd

    Construction Period

    1994-1995

  • Scope of Works
      • Construction of a 24-storey high commercial building including underground drainage works and associated building services installation.
      • CFA is about 7,167 square meters.
      • Provide 96 residential units.
....更多資料

Union Plaza
(1992-1994)

  • Project

    Union Plaza
    (1992-1994)

    Client

    Longcross Ltd.

    Construction Period

    1992-1994

  • Scope of Works
      • Construction of three 22-storey high residential blocks, a 2-storey high commercial podium and a 6 meters deep basement, including green areas, with emergency vehicle access and footpaths to be handed over to Highways Department.
      • This development provides 480 residential units.
      • The site area is about 6,670 square meters.
      • CFA is about 55,817 square meters.
....更多資料

Kennedy Town Centre
(1992-1994)

  • Project

    Kennedy Town Centre
    (1992-1994)

    Client

    The Bank of East Asia Ltd.

    Construction Period

    1992-1994

  • Scope of Works
      • Construction of a 39-storey high domestic building, a 22-storey high commercial complex including a two-level basement and underground drainage works.
      • CFA is about 37,260 square meters.
....更多資料

China Overseas Building
(1990-1991)

  • Project

    China Overseas Building
    (1990-1991)

    Client

    China Overseas Land & Investment Ltd.

    Construction Period

    1990-1991

  • Scope of Works
      • Design and construction of foundation, 7 meters deep basement and a 30-storeys high luxury office tower building.
      • The site area is about 1,256 square meters.
      • CFA is about 20,930 square meters.
....更多資料

The REGENT - Residential Development at Tai Po Town
(2017-Work in Progress)

  • Project

    The REGENT - Residential Development at Tai Po Town Lot No. 221, Shan Tong Road, Lai Chi Shan, New Territories
    (2017-Work in Progress)

    Client

    China Overseas Land & Investment Ltd.

    Construction Period

    2017-Work in Progress

  • Scope of Works
      • Construction of seventeen 9-storey to 17-storey residential tower blocks with a 2-storey platform carpark, machine room, club house and garden floor.
      • This development provides a total of 1,685 residential units.
      • The site area is about 37,696 square meters.
      • CFA is about 174,700 square meters.
....更多資料

MONTARA - Composite Development at Lohas Park Package
(2017 – Work in Progress)

  • Project

    MONTARA - Composite Development at Lohas Park Package 7A&B, TKOTL70RP, Site C1
    (2017 – Work in Progress)

    Client

    MTRC and Wheelock Group J.V.

    Construction Period

    2017 – Work in Progress

  • Scope of Works
      • Construction of a 5-storey podium shopping mall, and two 56-storey residential tower blocks built on top of the podium platform.
      • The development provides a total of 1,1,20 residential units.
      • The site area is about 31,569 square meters.
      • CFA is about 214,727 square meters.
....更多資料

Le PONT - Residential and Kindergarten
Development at So Kwun Wat Road,
Tuen Mun
(2017 – Work in Progress)

  • Project

    Le PONT - Residential and Kindergarten Development at TMTL 541 So Kwun Wat Road Area 56, Tuen Mun
    (2017 – Work in Progress)

    Client

    Vanke Real Estate (Hong Kong) Ltd.

    Construction Period

    2017 – Work in Progress

  • Scope of Works
      • Construction of five 18-storey residential tower blocks, 30 villas 2 to 3-storey high, a two-level basement carpark, a single-storey independent kindergarten and clubhouse, and five pedestrian footbridges connecting five residential rooftops.
      • The development provides a total of 1,1,34 residential units.
      • The site area is about 27,000 square meters.
      • GFA is about 124,426 square meters.
....更多資料

SOLCITY - Property Development at West Rail Long Ping Station (South)
(2017 – Work in Progress)

  • Project

    SOLCITY - Property Development at West Rail Long Ping Station (South), Yuen Long Town Lot No. 512
    (2017 – Work in Progress)

    Client

    Chinachem Group

    Construction Period

    2017 – Work in Progress

  • Scope of Works
      • Construction of four 17-storey residential tower blocks, and three 27-storey residential tower blocks, including a 2-storey platform carpark, machine room, clubhouse and garden floor.
      • The property provides a total of 720 residential units.
      • The site area is about 8,310 square meters
      • CFA is about 162,515 square meters
....更多資料

NAPA - Residential Development at So Kwun Wat Road, Tuen Mun
(2015-2017)

  • Project

    NAPA - Residential Development at TMTL 427, So Kwun Wat Road, Tuen Mun, N.T.
    (2015-2017)

    Client

    Wheelock Group

    Construction Period

    2015-2017

  • Scope of Works
      • Construction of five 10-storey tower blocks consisting of 389 residential units; 60 villas, 2 to 3-storey high; and a single-storey clubhouse on a one-level basement carpark.
      • The property provides a total of 460 residential units.
      • The site area is about 35,014 square meters.
      • CFA is about 58,811 square meters.
....更多資料

ONE KAI TAK - Residential Development at Kai Tak
(2015-2017)

  • Project

    ONE KAI TAK - Residential Development at NKIL 6516 & 6517, Kai Tak, Kowloon
    (2015-2017)

    Client

    China Overseas Land & Investment Ltd.

    Construction Period

    2015-2017

  • Scope of Works
      • Construction of four 32-storey to 33-storey residential tower blocks, 13 low-rise units, 5-storey high, 2 strips of 2-storey high retail colonnade, and a one-level basement carpark.
....更多資料

The BLOOMSWAY - Residential Development at So Kwun Wat, Tuen Mun
(2014-2017)

  • Project

    The BLOOMSWAY - Residential Development at TMTL 423, Area 48, Castle Road, So Kwun Wat, Tuen Mun, N. T.
    (2014-2017)

    Client

    Kerry Holding Ltd.

    Construction Period

    2014-2017

  • Scope of Works
      • Construction of twenty 7-storey to 18-storey domestic towers blocks built on top of 3 podium platforms for residential carpark, and 43 villas of 2 to 3-storey high.
      • The property provides a total of 1,100 residential units.
      • The site area is about 76,266 square meters.
      • CFA is about 137,010 square meters.
....更多資料

MAY FAIR BY THE SEA - Residential Development at Pak Shek Kok
(2013-2015)

  • Project

    MAY FAIR BY THE SEA - Residential Development at TPTL No.200 and 201, Pak Shek Kok, Tai Po, New Territories
    (2013-2015)

    Client

    Sino Group

    Construction Period

    2013-2015

  • Scope of Works
      • Construction of fifteen 18-storey domestic tower blocks on top of a two-level basement. The development comprises twelve 5-storey low-rise residential units, twelve 2-storey villas with carport.
      • The development includes shopping malls, clubhouses, carport, landscaped gardens, outdoor swimming pools, green areas and filtration systems.
      • The property provides a total of 994 residential units.
      • The site area is about 43,160 square meters.
      • CFA is about 205,691 square meters.
....更多資料

GRAND AUSTIN - Residential Development at Austin Station
(2012-2015)

  • Project

    GRAND AUSTIN - Residential Development at Austin Station, Site D, KIL N. 11129, Kowloon Contract No. D-106
    (2012-2015)

    Client

    Wheelock Group, New World Group and MTRC J.V.

    Construction Period

    2012-2015

  • Scope of Works
      • Construction of four 27-storey to 32-storey residential tower blocks with transfer plates on the 9th floor, a 1-storey clubhouse, and a 2-storey carpark and pedestrian footbridge linked to the existing residential buildings at Austin MTR station. The works included modification to the existing Austin Station at G/F and 1/F and a two-level basement carpark of 13.5 meters deep.
      • The property provides 687 residential units.
      • The site area is about 6,420 square meters
      • CFA is about 99,650 square meters.
....更多資料

THE AVENUE – Residential Development at Lee Tung Stree, Wanchai
(2011-2015)

  • Project

    THE AVENUE – Residential Development at IL9018(H15), Lee Tung Street / McGregor Street, Wanchai, Hong Kong
    (2011-2015)

    Client

    Sino Group, Hopewell Group and Urban Renewal Authority J.V.

    Construction Period

    2011-2015

  • Scope of Works
      • Construction of a semi and three-level basement, a 6-storey high podium including retail shops, landscape garden, swimming pools, clubhouse, and Government accommodation. The property has three 23-storey residential tower blocks built on top of transfer-plates. The basement was built on pile caps adopting a top-down method of construction.
      • The property provides a total of 1,299 residential units
      • The site area is about 7,738 square meters
      • CFA is about 129,510 square meters.
....更多資料

THE GREEN – Residential Development at Fan Kam Rd
2010-2013

  • Project

    THE GREEN – Residential Development at Fan Kam Rd DD100, Kwu Tung South, N.T.
    2010-2013

    Client

    China Overseas Land & Investment Ltd.

    Construction Period

    2010-2013

  • Scope of Works
      • Construction of 253 villas, 3 storey high complete with carport. The property has 3-storey and a single-storey clubhouses, landscaped gardens, outdoor swimming pools, green areas and filtration systems.
      • The property provides a total of 253 residential units.
      • The site area is about 87,644 square meters
      • CFA is about 54,510 square meters.
....更多資料

FESTIVAL CITY Phase 1 at Tai Wai Maintenance Centre Phase 1
(2007-2010)

  • Project

    FESTIVAL CITY Phase 1 at Tai Wai Maintenance Centre Phase 1
    (2007-2010)

    Client

    Cheung Kong Property and MTRC J.V.

    Construction Period

    2007-2010

  • Scope of Works
      • Construction of a 2-storey podium carpark floor on top of an existing podium deck of the MTR Maintenance Centre
      • The property has four 45-storey residential tower blocks
      • The works also included the construction of a transfer-plate for the Phase 2 development
      • The property provides a total of 1360 residential units.
      • CFA is about 169,309 square meters
....更多資料

LAKE SILVER at Ma On Shan
(2007-2009)

  • Project

    LAKE SILVER at Ma On Shan STTL 530
    (2007-2009)

    Client

    Sino Group

    Construction Period

    2007-2009

  • Scope of Works
      • Construction of seven 38-storey to 45-storey residential tower blocks, and a 2-storey podium constructed for clubhouse, shopping malls and a child care center built on top of an existing podium.
      • The property provides a total of 2,274 residential units
      • CFA is about 265,984 square meters.
....更多資料

VISION CITY – Residential Development at TWT 398 Tsuen Wan
(2004-2007)

  • Project

    VISION CITY – Residential Development at TWT 398 Tai Ho Road/ Yeung Uk Road, Tsuen Wan
    (2004-2007)

    Client

    Sino Group and Urban Renewal Authority J.V.

    Construction Period

    2004-2007

  • Scope of Works
      • Construction of five 48-storey to 51-storey residential tower blocks built on a 6-storey high podium with shopping arcade, carpark, swimming pool, club house, footbridges, public light bus terminus, GIC and external works.
      • The property provides a total of 1,900 residential units.
      • The site area is about 20,000 square meters.
      • CFA is about 222,480 square meters.
....更多資料

MOUNT BEACON – Residential Development at Cornwall Street
(2004-2006)

  • Project

    MOUNT BEACON – Residential Development at N.K.I.L. 6196, Cornwall Street, Kowloon Tong
    (2004-2006)

    Client

    Sino Group, Chinese Estates Holdings and Manhattan Group J.V.

    Construction Period

    2004-2006

  • Scope of Works
      • Construction of five 12-storey residential tower blocks, and twenty-two 3-storey houses built on top of a 3 to 4-storey high podium complete with carparks, sky garden, clubhouse and external works.
      • The property provides a total of 232 residential units and 22 houses.
      • CFA is about 54,500 square meters.
....更多資料

ONE SILVER SEA - Commercial and Residential Development at Hoi Fai Road
(2003-2006)

  • Project

    ONE SILVER SEA - Commercial and Residential Development at Hoi Fai Road KIL 11158, West Kowloon
    (2003-2006)

    Client

    Sino Group

    Construction Period

    2003-2006

  • Scope of Works
      • Construction of seven 41-storey residential tower blocks built on an eight-level podium, including retail shops, carparks, residential clubhouse, podium roof with the landscaped deck and swimming pools, footbridges, landscaped garden, and Green Area outside the site boundary.
      • The property provides a total of 1,052 residential units.
      • CFA is about 119,500 square meters.
....更多資料

RESIDENCE OASIS - Hang Hau Commercial & Residential Development
(2003-2005)

  • Project

    RESIDENCE OASIS - Hang Hau Commercial & Residential Development
    (2003-2005)

    Client

    Sino Group, MTRC and Kerry Holding Ltd. J.V.

    Construction Period

    2003-2005

  • Scope of Works
      • Construction of six 51-storey to 52-storey residential tower blocks built on a 4-storey high podium and a three-level basement, including addition, alteration and interfacing works, external works and all associated utilities works.
      • The property provides a total of 2,130 residential units.
      • The site area is about 9,700 square meters.
      • CFA is about 239,258 square meters.
....更多資料

REGALIA BAY - Residential Development at R.B.L. 1138 Stanley
(2001-2004)

  • Project

    REGALIA BAY - Residential Development at R.B.L. 1138 Stanley Hong Kong
    (2001-2004)

    Client

    Paliburg Group and China Overseas Land & Investment Ltd. J.V.

    Construction Period

    2001-2004

  • Scope of Works
      • Construction of 139 houses comprising a club house, swimming pool, including site formation, foundation, underground drainage and external works.
      • The property provides a total of 139 residential houses.
      • The site area is about 34,824 square meters.
      • CFA is about 58,229 square meters.
....更多資料

NERINE COVE - Residential Development at Tuen Mun
(1998-2000)

  • Project

    NERINE COVE - Residential Development at Tuen Mun Town Lot No. 407, Tuen Mun, N.T.
    (1998-2000)

    Client

    China Overseas Land & Investment Ltd.

    Construction Period

    1998-2000

  • Scope of Works
      • Construction of five 31-storey to 32-storey residential tower blocks built on a single-storey podium housing a covered carpark at ground floor, a clubhouse, a podium landscape deck; a lift tower and footbridge connecting the adjoining site over the existing light rail tracks, including associated drainage and external work.
      • The property provides a total of 1,246 residential units.
      • The site area is about 16,567 square meters.
      • CFA is about 119,571 square meters.
....更多資料

ON TAI ESTATE Block 10 and 11 at Anderson Road
(2014-2017)

  • Project

    ON TAI ESTATE Block 10 and 11 at Anderson Road Site C1 & C2 Public Rental Housing
    (2014-2017)

    Client

    Hong Kong Housing Authority

    Construction Period

    2014-2017

  • Scope of Works
      • Construction of two 27-storey domestic tower blocks;
      • One multi-storey carport;
      • A 7-storey non-domestic block for carpark, day care centre for elderly and public services;
      • These domestic blocks were constructed with precast façade, staircases and partition wall.
      • The development provides a total of 1,352 residential units.
      • The site area is about 18,235 square meters.
      • CFA is about 83,679 square meters.
....更多資料

SHEUNG CHUI COURT at Tsuen Wan and CHING CHUN COURT at Tsing Yi
(2014-2017)

  • Project

    SHEUNG CHUI COURT and CHING CHUN COURT - Home Ownership Scheme Development at Sha Tsui Road, Ex-Tai Wo Hau Factory Estate, Tsuen Wan and Ching Hong Road, Cheung Ching, Tsing Yi
    (2014-2017)

    Client

    Hong Kong Housing Authority

    Construction Period

    2014-2017

  • Scope of Works
      • Sha Tsui Road: Construction of three 30-storey to 39-storey non-standard domestic tower blocks; one semi-basement carpark; one 3-storey day care centre for the elderly; and one open public space area.
      • Ching Hong Road: Construction of 2 tower blocks of 25-storey non-standard domestic units; a temporary five-a-side football playground, reinstatement to site access and footpath. Both constructions were built with precast external façade, staircases, semi-precast slab, and partition wall.
      • The development provides a total of 1,427 residential units.
      • The site area is about 19,354 square meters.
      • CFA is about 101,000 square meters.
....更多資料

SHUI CHUEN O ESTATE at Sha Tin
(2011-2016)

  • Project

    SHUI CHUEN O ESTATE - Public Rental Housing at Sha Tin Area 52 Phases 1 to 4
    (2011-2016)

    Client

    Hong Kong Housing Authority

    Construction Period

    2011-2016

  • Scope of Works
      • Construction of eighteen 25-storey to 30-storey domestic tower blocks;
      • A 78 meters long pedestrian bridge, a 62 meters long footbridge and a public transport interchange;
      • One multi-storey carport;
      • One multi-storey circulation hubs integrated with RCP;.
      • These domestic blocks were constructed with precast façade, staircases and partition wall.
      • The development provides a total of 11,123 residential units.
      • The site area is about 107,000 square meters.
      • CFA is about 617,300 square meters.
....更多資料

Public Rental Housing Development at Kai Tak Site 1A Phases 1 and 2
(2010-2013)

  • Project

    Public Rental Housing Development at Kai Tak Site 1A Phases 1 and 2
    (2010-2013)

    Client

    Hong Kong Housing Authority

    Construction Period

    2010-2013

  • Scope of Works
      • Construction of three 41-storey non-standard residential tower blocks;
      • A 3-storey Business Center;
      • A single-storey carpark, a comprehensive youth service community centre, a neighbourhood elderly day centre, refuse collection points.
      • The development provides a total of 5,204 residential units.
      • The site area is about 37,900 square meters.
      • CFA is about 250,164 square meters.
....更多資料

Choi Wan Road Site 2 Phase (Non-Domestic Portion), Site 3A and District Open Space Site A
(2008-2011)

  • Project

    Choi Wan Road Site 2 Phase (Non-Domestic Portion), Site 3A and District Open Space Site A
    (2008-2011)

    Client

    Hong Kong Housing Authority

    Construction Period

    2008-2011

  • Scope of Works
      • Construction of four 37-storey to 41-storey domestic tower blocks;
      • A 7-storey shopping mall with a 5-storey carpark;
      • A single-storey estate management office;
      • A 2-storey refuse collection point;
      • One district open space area.
      • The development provides a total of 2,704 residential units.
      • The site area is about 30,500 square meters.
      • CFA is about 143,676 square meters.
....更多資料

HOI LAI ESTATE - North Part of West Kowloon Reclamation Site
(2002-2007)

  • Project

    HOI LAI ESTATE - North Part of West Kowloon Reclamation Site 10, Phases 1 to 4
    (2002-2007)

    Client

    Hong Kong Housing Authority

    Construction Period

    2002-2007

  • Scope of Works
      • Construction of twelve 32-storey to 41-storey domestic tower blocks including associated drainage and external works such as roads, emergency and service access, play area, covered walkway;
      • A 4-storey non-domestic block for carpark, shops and public services.
      • The development provides a total of 4,908 residential units.
      • The site area is about 45,026 square meters.
      • CFA is about 358,073 square meters.
....更多資料

Redevelopment of Kwai Chung Estate Phase 4
(2001-2005)

  • Project

    Redevelopment of Kwai Chung Estate Phase 4
    (2001-2005)

    Client

    Hong Kong Housing Authority

    Construction Period

    2001-2005

  • Scope of Works
      • Construction of two 41-storey New Harmony 1 (Option 6) domestic tower blocks;
      • One 36-storey New Harmony Annex 5 (Option 1) Block on a 2-storey podium including the foundation for a circular EVA ramp.
      • The redevelopment provides a total of 1,983 residential units.
      • CFA is about 114,996 square meters.
....更多資料

TIN YAN ESTATE - Tin Shui Wai Area 101 Phase 2
(2001-2004)

  • Project

    TIN YAN ESTATE - Tin Shui Wai Area 101 Phase 2
    (2001-2004)

    Client

    Hong Kong Housing Authority

    Construction Period

    2001-2004

  • Scope of Works
      • Construction of four 34-storey domestic tower blocks;
      • An 8-storey school building consisting of 30 classrooms;
      • A 7-storey community building including external and drainage works.
      • The development provides a total of 2,112 residential units.
      • CFA is about 126,720 square meters.
....更多資料

Redevelopment of Upper Ngau Tau Kok Phase1
(2000-2002)

  • Project

    Redevelopment of Upper Ngau Tau Kok Phase1
    (2000-2002)

    Client

    Hong Kong Housing Authority

    Construction Period

    2000-2002

  • Scope of Works
      • Construction of two 41-storey Harmony 1 rental tower blocks;
      • A 19-storey Annex block;
      • A 17-storey Single Aspect Block.
      • The redevelopment provides a total of 2,133 residential units.
      • CFA is about 146,160 square meters.
....更多資料

Redevelopment of Upper Wong Tai Sin Estate Phase 1
(1998-2000)

  • Project

    Redevelopment of Upper Wong Tai Sin Estate Phase 1
    (1998-2000)

    Client

    Hong Kong Housing Authority

    Construction Period

    1998-2000

  • Scope of Works
      • Construction of four 41-storey Harmony 1 rental tower blocks;
      • A 21-storey Annex block;
      • A 10-storey Single Aspect Block.
      • The redevelopment provides a total of 3,511 residential units.
      • CFA is about 200,302 square meters.
....更多資料

Redevelopment of Shek Yam Estate
Phase 2 at Tsuen Wan
(1997-2000)

  • Project

    Redevelopment of Shek Yam Estate Phase 2 at Tsuen Wan
    (1997-2000)

    Client

    Hong Kong Housing Authority

    Construction Period

    1997-2000

  • Scope of Works
      • Construction of four 21-storey to 41-storey rental tower blocks.
      • The redevelopment provides a total of 2,320 residential units.
      • CFA is about 205,000 square meters.
....更多資料

TIN SHING COURT - Tin Shui Wai
(1997-1999)

  • Project

    TIN SHING COURT - Tin Shui Wai Area 3, Phase 4
    (1997-1999)

    Client

    Hong Kong Housing Authority

    Construction Period

    1997-1999

  • Scope of Works
      • Construction of two 41-storey Harmony 1 domestic tower blocks;
      • Three 31-storey to 41-storey Concord domestic tower blocks.
      • The development provides a total of 2,100 residential units.
      • The site area is about 19,551 square meters.
      • CFA is about 164,774 square meters.
....更多資料

TIN CHUNG COURT - Tin Shui Wai
(1997-1999)

  • Project

    TIN CHUNG COURT - Tin Shui Wai Area 31, Phase 3
    (1997-1999)

    Client

    Hong Kong Housing Authority

    Construction Period

    1997-1999

  • Scope of Works
      • Construction of four 41-storey Harmony 1 domestic tower blocks.
      • The development provides a total of 2,560 residential units.
      • The site area is about 20,600 square meters.
      • CFA is about 184,420 square meters.
....更多資料

Redevelopment of Hing Wah Estate - Phase I
(1996-1999)

  • Project

    Redevelopment of Hing Wah Estate - Phase I
    (1996-1999)

    Client

    Hong Kong Housing Authority

    Construction Period

    1996-1999

  • Scope of Works
      • Construction of three 39-storey Harmony 1 rental tower blocks.
      • The redevelopment provides a total of 2,277 residential units.
      • The site area is about 21,000 square meters.
      • CFA is about 169,453 square meters.
....更多資料

Redevelopment of Tsui Ping Estate Phases 4, 6 & 8
(1987-1996)

  • Project

    Redevelopment of Tsui Ping Estate Phases 4, 6 & 8
    (1987-1996)

    Client

    Hong Kong Housing Authority

    Construction Period

    1987-1996

  • Scope of Works
      • Construction of fifteen 22-storey to 37-storey domestic tower blocks;
      • Three 2 to 4-storey high carparks;
      • A 7-storey school building.
      • The redevelopment provides a total of 7,391 residential units.
      • Total area of 3 sites is about 51,900 square meters.
      • CFA are about 448,651 square meters.
....更多資料

Redevelopment of Siu Sai Wan Estate, Phase 2
(1987-1993)

  • Project

    Redevelopment of Siu Sai Wan Estate, Phase 2
    (1987-1993)

    Client

    Hong Kong Housing Authority

    Construction Period

    1987-1993

  • Scope of Works
      • Construction of five 27-storey linear domestic tower blocks.
      • The redevelopment provides a total of 5,077 residential units.
      • The site area is about 87,388 square meters.
      • CFA is about 346,055 square meters.
....更多資料

Redevelopment of Lei Tung Estate,
Phase 1
(1984-1986)

  • Project

    Redevelopment of Lei Tung Estate, Phase 1
    (1984-1986)

    Client

    Hong Kong Housing Authority

    Construction Period

    1984-1986

  • Scope of Works
      • Construction of four 35-storey Trident domestic units, including primary school, commercial office, carparks and market.
      • The redevelopment provides a total of 3,748 residential units.
      • CFA is about 222,063 square meters.
....更多資料

Redevelopment of Tai Wo Hau Estate.
Phase 2
(1982-1984)

  • Project

    Redevelopment of Tai Wo Hau Estate. Phase 2
    (1982-1984)

    Client

    Hong Kong Housing Authority

    Construction Period

    1982-1984

  • Scope of Works
      • Construction of four 26-storey to 28-storey rental tower blocks.
      • The redevelopment provides a total of 2,231 residential units.
      • The site area is about 24,100 square meters.
      • CFA is about 113,449 square meters.
....更多資料