Design and Construction of North Lantau Hospital Hong Kong Infection Control Centre
(2020.8-2021.1)
Hong Kong International Airport
2020.8-2021.1
The Hong Kong Infection Control Center of North Lantau Hospital, with a construction area of about 450,000 square feet, provides 136 negative pressure wards, more than 800 beds and supporting medical facilities. Construction started in September 2020 and completed on January 20, 2021. The total construction period is only 122 days. This is the first smart hospital in Hong Kong to adopt Modular Integrated Construction (MiC) in negative pressure isolation wards. This engineering contract provides electrical, air-conditioning, fire protection, weak current and other system installations for the above-mentioned projects.
Design and Construction of Chinese Medicine Hospital and Government Chinese Medicines Testing Institute in Tseung Kwan O
(2021-Work in Progress)
Architectural Services Department
2021-Work in Progress
The site covers an area of approximately 60,056 square meters. The project includes design and construction:
1. A 9-storey TCM hospital building (400 beds in total) with a 1-storey underground garage, including wards, outpatient clinics, pharmacies and scientific research facilities, mainly providing allied health services, diagnostic and ambulatory procedures and community health services;
2. A 5-storey Chinese medicine testing center, including laboratory, medicinal botanical garden and cooperation and training center, mainly for scientific research and testing purposes.
This project provides electromechanical and related systems for the above projects.
Superstructure And Associated Work For Redevelopment of Kwong Wah Hospital(Phase 1)
(2018-Work in Progress)
Hospital Authority
2018-Work in Progress
Installation of electrical and air-conditioning systems for the expansion project of Guanghua Hospital.
The project includes a two-story basement and a 19-story superstructure, covering an area of about 8,202 square meters and a construction area of about 146,000 square meters.
Design and Construction of CUHK Medical Centre at Site B
(2016-2020)
The Chinese University of Hong Kong
2016-2020
ACMV/ Electrical/ Fire Services/ Low Voltage Cubicle Switchboard/ Diesel Generator/ UPS/ ELV/ Town Gas System Installation
Design and Construction of Centre of Excellence in Paediatrics in Kai Tak Development (M&E Installation)
(2013-2017)
Architectural Services Department
2013-2017
The project involves the design and construction of two 12 storey independent buildings (blocks a and b). These buildings are connected by overpasses, with a central courtyard and a 2-storey basement for parking and other purposes. Block a provides clinical services, such as comprehensive rehabilitation center, main operating room, laboratory, data center and education and training facilities; Block B and block B provide patient related facilities and will include a variety of child friendly design and support facilities as well as clinical facilities.
The project involves the design and construction of air conditioning and laboratory central exhaust system, low-voltage distribution system and ultra-low voltage system, fire-fighting facilities, gas and hot water facilities.
The Construction of Superstructure of Block B for St. Paul’s Hospital Redevelopment
(2012-2015)
St. Paul's Hospital
2012-2015
ACMV, Electrical and Town Gas Installation
MVAC and Electrical Installation for Hong Kong Palace Museum
(2019-2021)
West Kowloon Cultural District Authority
2019-2021
The Hong Kong Palace Museum, which will have a 7,600-square-meter exhibition hall, and other museum facilities include a 400-seat lecture hall, event rooms, restaurants and shops. This project supplies and installs electrical and extra-low voltage electrical systems, air-conditioning and ventilation systems for the Hong Kong Palace Museum.
The Development of Hostel and Academic Building Complex at 30 Renfrew Road, Kowloon Tong for Hong Kong Baptist University
(2021-Work in Progress)
Architectural Services Department
2021-Work in Progress
The project has a total construction area of about 56,284 square meters and a site area of 7,500 square meters. The main projects include the construction of four 13- to 15-storey student dormitories (a total of 1,103 dormitory rooms), a teaching complex and a pedestrian bridge connecting the four buildings, including BF, Parts of GF, UGF, 1F and 2F include performance rooms, musical instrument practice rooms and classrooms. Part of 2F and the floors above 2F are dormitory rooms and multi-purpose rooms.
This project provides electrical and mechanical and related system installation for the above project
Sky Bridge connection Terminal 1 and North Satellite Concourse
(2018-2022)
Hong Kong International Airport
2018-2022
The project plans to build the Sky Corridor to connect Terminal 1 and the North Satellite Passenger Corridor. It is 200 meters long, 20 meters high, and 28 meters above the ground, allowing the largest passenger aircraft type A380 to pass under the bridge. The mechanical and electrical engineering part includes air-conditioning, electrical, fire protection and water supply and drainage systems.
Design & Construction of Fire Services Training School Cum Driving School
(2012-2015)
Architectural Services Department
2012-2015
The project comprises of 19 Nos of simulated fire-fighting scenes, 10 Nos of 4 to 6 storey dormitory and training centres.
"Design and Build for Hong Kong-Zhuhai-Macao Bridge – Hong Kong Link Road Section between Scenic Hill and HKBCF "
(2012-2019)
Highways Department
2012-2019
This section of works includes 1.8 km tunnels, 1.6 km link roads, all associated facilities and ancillary buildings with footprint covering Bridges, Link roads, Tunnels, Viaducts, Tunnel portal, Ventilation building, and Highway operation and maintenance area.
HKIA (Airport) North Commercial District Enabling and Option Fit-out Works for APM Depot
(2016-2019)
Airport authority
2016-2019
Provide all mechanical and electrical equipment for the machine room and logistics supply station of the passenger rapid transit system located in the North Business District of the airport.
Temporary Quarantine Facilties at Lei Yue Mun Park, Basketball Court, No. 75 Chai Wan Road, Chai Wan, Hong Kong
(2020.2-2020.4)
Leisure and Cultural Services Department
2020.2-2020.4
The first quarantine center in Hong Kong, known as the Hong Kong version of the "Huoshenshan" hospital. The project involves the design and construction of 118 quarantine units. This project provides the installation of electrical, air-conditioning, and fire protection systems for the above-mentioned projects. The total project time is only 28 days.
"Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories"
(2020.4-2020.7)
Architectural Services Department
2020.4-2020.7
Installation of electrical, air-conditioning, fire-fighting and plumbing systems at Penny's Bay Emergency Isolation Centre. The project includes the design and construction of 700 MIC isolation units.
Installation of mechanical and electrical engineering in Area 3B of Penny's Bay Temporary Isolation Center
(2020.8-2020.11)
Architectural Services Department
2020.8-2020.11
Installation of electrical, air-conditioning, firefighting and plumbing systems in Penny's Bay Temporary Isolation Center (3B). The project contains 850 MIC units.
Electrical and MVAC Installation for Wong Chuk Hang Station, Package Three, Aberdeen Inland Lot No. 467, Site C (Commercial and Residential Accommodation)
(2021-Work in Progress)
Cheung Kong Holdings
2021-Work in Progress
The project covers Site C of the Wong Chuk Hang site. It is planned to build a five-story platform, including shopping malls, car parks and clubhouses. This project provides the installation of electrical, ultra-low voltage electrical, ventilation, air-conditioning and building automation systems for the above project.
Proposed Development at No. 1 to 11, Au Pui Wan Street, Fo Tan, Hong Kong for Electrical, ELV, MVAC and SAC Installation
(2019-Work in Progress)
CENTRALCON INVESTMENT HOLDING COMPANY LIMITED
2019-Work in Progress
It consists of four 40- to 41-storey non-standard residential buildings (1335 units), and the other 4-storey podium houses retail centers, shops, clubs, swimming pools, kindergartens, car parks and transportation interchanges. This project provides electrical, ultra-low pressure works and installation of air-conditioning ventilation system for the above project.
Electrical Installation for Construction of Public Rental Housing Development at Tuen Mun Area 54 Sites 1&1A
(2019-2021)
Housing Department
2019-2021
Consists of four non-standard residential buildings (4232 units) of 37 to 39 storeys high, with retail center, shops, NEC, EMO, DCCE, kindergarten and semi-underground car park. This project provides electrical and extra low voltage electrical systems for the above project.
Electrical and ELV Installation for URA Hai Tan Street/Kweilin Street and Pei Ho Street Development at NKIL6506, Sham Shui Po, Kowloon
(2017-2020)
Cheung Kong Holdings
2017-2020
The project covers 3 sites (Site A, Site B & Site C), and it is planned to build 4 residential buildings with 29 to 36 storeys and podiums, providing a total of 877 residential units. This project provides the installation of electrical and extra-low voltage electrical systems for the above project.
Electrical and Extra Low Votlage Installation for the Residential Development at No. 500, Kwun Chui Road, Tuen Mun, New Territories
(2018-2020)
Evergrande Group
2018-2020
The project plans to build 4 residential buildings with a height of 20 floors, together with 22 detached houses and a clubhouse, providing a total of 1947 residential units. This project provides the installation of electrical and extra-low voltage electrical systems for the above projects.
HVAC Installation for Tower and Podium NDSC for the Proposed Residential Development at Tai po Town Lot No. 221, Shan Tong Road, Lai Chi Shan, Tai Po, N.T.
(2017-2020)
China Overseas Land & Investment Ltd.
2017-2020
The project mainly includes 17 residential buildings with 10 to 19 floors, including clubhouse and parking lot, supply and installation of electrical, ultra-low voltage electrical, ventilation and split machine equipment.
Electrical Installation for Construction of Public Rental Housing Development at Fo Tan (In Sha Tin Areas 16 & 58D) Phases 1 and 2 (Nominated Sub-Contract)
(2016-2019)
Hong Kong Housing Authority
2016-2019
Supply and install electrical and extra low voltage electrical for 5 residential buildings with 34 to 39 floors, including commercial and parking lots.
Proposed Residential Development at Shek Kok Road, Tseung Kwan O, TKOTL No. 111, Area 85 (Site B) (ECA Installation Direct Contract)
(2013-2015)
Cheung Kong Holdings
2013-2015
The project mainly consists of three residential buildings, with a total of 872 residential units on the 36th floor of blocks 1 and 2 and the 37th floor of block 3, including the parking lot and club on the third floor, and the supply and installation of electrical, ultra-low voltage electrical, ventilation and split machine equipment. The floor area is about 10200 square meters and the total construction area is about 81500 square meters.
Mechanical & Electrical Installatoin for Proposed Hotel Development at Tung Chung Town Lot No. 38, Lantau Island, Hong Kong
(2017-2019)
Shimao Property Holdings Limited
(2017-2019
The project provides electrical and low-voltage power, fire service and air conditioning system for three 13-15 storey hotel buildings, 3-4 storey platforms and basement.
Proposed MGM Cotai Project, MGM Grand Paradise
(2014-2016)
MGM Grand Paradise Ltd)
2014-2016
The development consists 5-star hotel, service suites and podium including hotel ballrooms, casino, dining areas, retail shopsand basement.
The supply and installation of Building Services for the development consists:
1.Electrical Services with HV & LV Switch Boards, Transformer, Ring Main Unit, and LV electrical distribution system.
2.MVAC System with Chiller, Cooling Tower, Heat Pump, Water Pump. AHU, Fans, Boiler, Heat Exchanger, and etc.
3.PD System with Calorifier, UV Sterilizer, Filters, Reverse Osmosis, Water Pumps, and etc.
4.FS System with Fire pump, Sprinkler pump, Drencher pump etc.
5.HV Generator Sets & Dynamic Rotary UPS.
"Studio City Macau, NSC Works for Tower A&B MEP Services"
(2012-2015)
Studio City Development Limited
2012-2015
Provided and installed electrical, air-conditioning, firefighting, water supply and drainage works for a hotel project with a total of 84 floors, including 1,660 luxury suites.
Hong Kong Disney Resort Project - GC7 Fantasyland
(2003-2005)
Hongkong International Theme Parks Limited
2003-2005
The supply and Installation of Electrical Wervices consists:
Electrical supply system to the ride / audio / show system, restaurants and kitchens inside the park.
General lighting system and dimming system for lighting effect for show.
Cable containments and interface work to serve the audio, parkwide, ride, show control and miscellaneous systems.
Mechanical & Electrical Installatoin for Wynn Resorts Macau
(2004-2005)
Wynn Resorts (Macau) S.A.
2004-2005
Supply and installation of high voltage and low voltage electrical equipment works, including backup generator and low voltage switch cabinet.