Mechanical & Electrical Engineering

Mechanical & Electrical Engineering

Mechanical & Electrical Engineering

  • Design and Construction of North Lantau Hospital Hong Kong Infection Control Centre
    (Hong Kong International Airport)
  • Design and Construction of Chinese Medicine Hospital and Government Chinese Medicines Testing Institute in Tseung Kwan O
    (2021-Work in Progress)
  • Superstructure And Associated Work For Redevelopment of Kwong Wah Hospital(Phase 1)
    (2018-Work in Progress)
  • Design and Construction of CUHK Medical Centre at Site B
    (2016-2020)
  • Design and Construction of Centre of Excellence in Paediatrics in Kai Tak Development (M&E Installation)
    (2013-2017)
  • The Construction of Superstructure of Block B for St. Paul’s Hospital Redevelopment
    (2012-2015)
  • MVAC and Electrical Installation for Hong Kong Palace Museum
    (2019-2021)
  • The Development of Hostel and Academic Building Complex at 30 Renfrew Road, Kowloon Tong for Hong Kong Baptist University
    (2021-Work in Progress)
  • Sky Bridge connection Terminal 1 and North Satellite Concourse
    (2018-2022)
  • Design & Construction of Fire Services Training School Cum Driving School
    (2012-2015)
  • "Design and Build for Hong Kong-Zhuhai-Macao Bridge – Hong Kong Link Road Section between Scenic Hill and HKBCF "
    (2012-2019)
  • HKIA (Airport) North Commercial District Enabling and Option Fit-out Works for APM Depot
    (2016-2019)
  • Temporary Quarantine Facilties at Lei Yue Mun Park, Basketball Court, No. 75 Chai Wan Road, Chai Wan, Hong Kong
    (2020.2-2020.4)
  • "Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories"
    (2020.4-2020.7)
  • Installation of mechanical and electrical engineering in Area 3B of Penny's Bay Temporary Isolation Center
    (2020.8-2020.11)
  • Electrical and MVAC Installation for Wong Chuk Hang Station, Package Three, Aberdeen Inland Lot No. 467, Site C (Commercial and Residential Accommodation)
    (2021-Work in Progress)
  • Proposed Development at No. 1 to 11, Au Pui Wan Street, Fo Tan, Hong Kong for Electrical, ELV, MVAC and SAC Installation
    (2019-Work in Progress)
  • Electrical Installation for Construction of Public Rental Housing Development at Tuen Mun Area 54 Sites 1&1A
    (2019-2021)
  • Electrical and ELV Installation for URA Hai Tan Street/Kweilin Street and Pei Ho Street Development at NKIL6506, Sham Shui Po, Kowloon
    (2017-2020)
  • Electrical and Extra Low Votlage Installation for the Residential Development at No. 500, Kwun Chui Road, Tuen Mun, New Territories
    (2018-2020)
  • HVAC Installation for Tower and Podium NDSC for the Proposed Residential Development at Tai po Town Lot No. 221, Shan Tong Road, Lai Chi Shan, Tai Po, N.T.)
    (2017-2020)
  • Electrical Installation for Construction of Public Rental Housing Development at Fo Tan (In Sha Tin Areas 16 & 58D) Phases 1 and 2 (Nominated Sub-Contract)
    (2016-2019)
  • Proposed Residential Development at Shek Kok Road, Tseung Kwan O, TKOTL No. 111, Area 85 (Site B) (ECA Installation Direct Contract)
    (2013-2015)
  • Mechanical & Electrical Installatoin for Proposed Hotel Development at Tung Chung Town Lot No. 38, Lantau Island, Hong Kong
    (2017-2019)
  • Proposed MGM Cotai Project, MGM Grand Paradise
    (2014-2016)
  • "Studio City Macau, NSC Works for Tower A&B MEP Services"
    (2012-2015)
  • Hong Kong Disney Resort Project - GC7 Fantasyland
    (2003-2005)
  • Mechanical & Electrical Installatoin for Wynn Resorts Macau
    (2004-2005)

設計及建造

醫院

院校建設

酒店及商場

辦公大樓﹑廠房及物流中心

私人屋苑

公營房屋

X

Design and Construction of North Lantau Hospital Hong Kong Infection Control Centre
(Hong Kong International Airport)

  • Project

    Design and Construction of North Lantau Hospital Hong Kong Infection Control Centre
    (2020.8-2021.1)

    Client

    Hong Kong International Airport

    Construction Period

    2020.8-2021.1

  • Scope of Works

      The Hong Kong Infection Control Center of North Lantau Hospital, with a construction area of about 450,000 square feet, provides 136 negative pressure wards, more than 800 beds and supporting medical facilities. Construction started in September 2020 and completed on January 20, 2021. The total construction period is only 122 days. This is the first smart hospital in Hong Kong to adopt Modular Integrated Construction (MiC) in negative pressure isolation wards. This engineering contract provides electrical, air-conditioning, fire protection, weak current and other system installations for the above-mentioned projects.

....更多資料

Design and Construction of Chinese Medicine Hospital and Government Chinese Medicines Testing Institute in Tseung Kwan O
(2021-Work in Progress)

  • Project

    Design and Construction of Chinese Medicine Hospital and Government Chinese Medicines Testing Institute in Tseung Kwan O
    (2021-Work in Progress)

    Client

    Architectural Services Department

    Construction Period

    2021-Work in Progress

  • Scope of Works

      The site covers an area of approximately 60,056 square meters. The project includes design and construction:
      1. A 9-storey TCM hospital building (400 beds in total) with a 1-storey underground garage, including wards, outpatient clinics, pharmacies and scientific research facilities, mainly providing allied health services, diagnostic and ambulatory procedures and community health services;
      2. A 5-storey Chinese medicine testing center, including laboratory, medicinal botanical garden and cooperation and training center, mainly for scientific research and testing purposes.
      This project provides electromechanical and related systems for the above projects.

....更多資料

Superstructure And Associated Work For Redevelopment of Kwong Wah Hospital(Phase 1)
(2018-Work in Progress)

  • Project

    Superstructure And Associated Work For Redevelopment of Kwong Wah Hospital(Phase 1)
    (2018-Work in Progress)

    Client

    Hospital Authority

    Construction Period

    2018-Work in Progress

  • Scope of Works

      Installation of electrical and air-conditioning systems for the expansion project of Guanghua Hospital.
      The project includes a two-story basement and a 19-story superstructure, covering an area of about 8,202 square meters and a construction area of about 146,000 square meters.

....更多資料

Design and Construction of CUHK Medical Centre at Site B
(2016-2020)

  • Project

    Design and Construction of CUHK Medical Centre at Site B
    (2016-2020)

    Client

    The Chinese University of Hong Kong

    Construction Period

    2016-2020

  • Scope of Works

      ACMV/ Electrical/ Fire Services/ Low Voltage Cubicle Switchboard/ Diesel Generator/ UPS/ ELV/ Town Gas System Installation

....更多資料

Design and Construction of Centre of Excellence in Paediatrics in Kai Tak Development (M&E Installation)
(2013-2017)

  • Project

    Design and Construction of Centre of Excellence in Paediatrics in Kai Tak Development (M&E Installation)
    (2013-2017)

    Client

    Architectural Services Department

    Construction Period

    2013-2017

  • Scope of Works
      • The project involves the design and construction of two 12 storey independent buildings (blocks a and b). These buildings are connected by overpasses, with a central courtyard and a 2-storey basement for parking and other purposes. Block a provides clinical services, such as comprehensive rehabilitation center, main operating room, laboratory, data center and education and training facilities; Block B and block B provide patient related facilities and will include a variety of child friendly design and support facilities as well as clinical facilities.

         

      • The project involves the design and construction of air conditioning and laboratory central exhaust system, low-voltage distribution system and ultra-low voltage system, fire-fighting facilities, gas and hot water facilities.

....更多資料

The Construction of Superstructure of Block B for St. Paul’s Hospital Redevelopment
(2012-2015)

  • Project

    The Construction of Superstructure of Block B for St. Paul’s Hospital Redevelopment
    (2012-2015)

    Client

    St. Paul's Hospital

    Construction Period

    2012-2015

  • Scope of Works

      ACMV, Electrical and Town Gas Installation

....更多資料

MVAC and Electrical Installation for Hong Kong Palace Museum
(2019-2021)

  • Project

    MVAC and Electrical Installation for Hong Kong Palace Museum
    (2019-2021)

    Client

    West Kowloon Cultural District Authority

    Construction Period

    2019-2021

  • Scope of Works

      The Hong Kong Palace Museum, which will have a 7,600-square-meter exhibition hall, and other museum facilities include a 400-seat lecture hall, event rooms, restaurants and shops. This project supplies and installs electrical and extra-low voltage electrical systems, air-conditioning and ventilation systems for the Hong Kong Palace Museum.

....更多資料

The Development of Hostel and Academic Building Complex at 30 Renfrew Road, Kowloon Tong for Hong Kong Baptist University
(2021-Work in Progress)

  • Project

    The Development of Hostel and Academic Building Complex at 30 Renfrew Road, Kowloon Tong for Hong Kong Baptist University
    (2021-Work in Progress)

    Client

    Architectural Services Department

    Construction Period

    2021-Work in Progress

  • Scope of Works

      The project has a total construction area of about 56,284 square meters and a site area of 7,500 square meters. The main projects include the construction of four 13- to 15-storey student dormitories (a total of 1,103 dormitory rooms), a teaching complex and a pedestrian bridge connecting the four buildings, including BF, Parts of GF, UGF, 1F and 2F include performance rooms, musical instrument practice rooms and classrooms. Part of 2F and the floors above 2F are dormitory rooms and multi-purpose rooms.
      This project provides electrical and mechanical and related system installation for the above project

....更多資料

Sky Bridge connection Terminal 1 and North Satellite Concourse
(2018-2022)

  • Project

    Sky Bridge connection Terminal 1 and North Satellite Concourse
    (2018-2022)

    Client

    Hong Kong International Airport

    Construction Period

    2018-2022

  • Scope of Works

      The project plans to build the Sky Corridor to connect Terminal 1 and the North Satellite Passenger Corridor. It is 200 meters long, 20 meters high, and 28 meters above the ground, allowing the largest passenger aircraft type A380 to pass under the bridge. The mechanical and electrical engineering part includes air-conditioning, electrical, fire protection and water supply and drainage systems.

....更多資料

Design & Construction of Fire Services Training School Cum Driving School
(2012-2015)

  • Project

    Design & Construction of Fire Services Training School Cum Driving School
    (2012-2015)

    Client

    Architectural Services Department

    Construction Period

    2012-2015

  • Scope of Works

      The project comprises of 19 Nos of simulated fire-fighting scenes,  10 Nos of 4 to 6 storey dormitory and training centres.

....更多資料

"Design and Build for Hong Kong-Zhuhai-Macao Bridge – Hong Kong Link Road Section between Scenic Hill and HKBCF "
(2012-2019)

  • Project

    "Design and Build for Hong Kong-Zhuhai-Macao Bridge – Hong Kong Link Road Section between Scenic Hill and HKBCF "
    (2012-2019)

    Client

    Highways Department

    Construction Period

    2012-2019

  • Scope of Works

      This section of works includes 1.8 km tunnels, 1.6 km link roads, all associated facilities and ancillary buildings with footprint covering Bridges, Link roads, Tunnels, Viaducts, Tunnel portal, Ventilation building, and Highway operation and maintenance area.  

....更多資料

HKIA (Airport) North Commercial District Enabling and Option Fit-out Works for APM Depot
(2016-2019)

  • Project

    HKIA (Airport) North Commercial District Enabling and Option Fit-out Works for APM Depot
    (2016-2019)

    Client

    Airport authority

    Construction Period

    2016-2019

  • Scope of Works

      Provide all mechanical and electrical equipment for the machine room and logistics supply station of the passenger rapid transit system located in the North Business District of the airport.

....更多資料

Temporary Quarantine Facilties at Lei Yue Mun Park, Basketball Court, No. 75 Chai Wan Road, Chai Wan, Hong Kong
(2020.2-2020.4)

  • Project

    Temporary Quarantine Facilties at Lei Yue Mun Park, Basketball Court, No. 75 Chai Wan Road, Chai Wan, Hong Kong
    (2020.2-2020.4)

    Client

    Leisure and Cultural Services Department

    Construction Period

    2020.2-2020.4

  • Scope of Works

      The first quarantine center in Hong Kong, known as the Hong Kong version of the "Huoshenshan" hospital. The project involves the design and construction of 118 quarantine units. This project provides the installation of electrical, air-conditioning, and fire protection systems for the above-mentioned projects. The total project time is only 28 days.

....更多資料

"Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories"
(2020.4-2020.7)

  • Project

    "Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories"
    (2020.4-2020.7)

    Client

    Architectural Services Department

    Construction Period

    2020.4-2020.7

  • Scope of Works

      Installation of electrical, air-conditioning, fire-fighting and plumbing systems at Penny's Bay Emergency Isolation Centre. The project includes the design and construction of 700 MIC isolation units.

....更多資料

Installation of mechanical and electrical engineering in Area 3B of Penny's Bay Temporary Isolation Center
(2020.8-2020.11)

  • Project

    Installation of mechanical and electrical engineering in Area 3B of Penny's Bay Temporary Isolation Center
    (2020.8-2020.11)

    Client

    Architectural Services Department

    Construction Period

    2020.8-2020.11

  • Scope of Works

      Installation of electrical, air-conditioning, firefighting and plumbing systems in Penny's Bay Temporary Isolation Center (3B). The project contains 850 MIC units.

....更多資料

Electrical and MVAC Installation for Wong Chuk Hang Station, Package Three, Aberdeen Inland Lot No. 467, Site C (Commercial and Residential Accommodation)
(2021-Work in Progress)

  • Project

    Electrical and MVAC Installation for Wong Chuk Hang Station, Package Three, Aberdeen Inland Lot No. 467, Site C (Commercial and Residential Accommodation)
    (2021-Work in Progress)

    Client

    Cheung Kong Holdings

    Construction Period

    2021-Work in Progress

  • Scope of Works

      The project covers Site C of the Wong Chuk Hang site. It is planned to build a five-story platform, including shopping malls, car parks and clubhouses. This project provides the installation of electrical, ultra-low voltage electrical, ventilation, air-conditioning and building automation systems for the above project.

....更多資料

Proposed Development at No. 1 to 11, Au Pui Wan Street, Fo Tan, Hong Kong for Electrical, ELV, MVAC and SAC Installation
(2019-Work in Progress)

  • Project

    Proposed Development at No. 1 to 11, Au Pui Wan Street, Fo Tan, Hong Kong for Electrical, ELV, MVAC and SAC Installation
    (2019-Work in Progress)

    Client

    CENTRALCON INVESTMENT HOLDING COMPANY LIMITED

    Construction Period

    2019-Work in Progress

  • Scope of Works

      It consists of four 40- to 41-storey non-standard residential buildings (1335 units), and the other 4-storey podium houses retail centers, shops, clubs, swimming pools, kindergartens, car parks and transportation interchanges. This project provides electrical, ultra-low pressure works and installation of air-conditioning ventilation system for the above project.

....更多資料

Electrical Installation for Construction of Public Rental Housing Development at Tuen Mun Area 54 Sites 1&1A
(2019-2021)

  • Project

    Electrical Installation for Construction of Public Rental Housing Development at Tuen Mun Area 54 Sites 1&1A
    (2019-2021)

    Client

    Housing Department

    Construction Period

    2019-2021

  • Scope of Works

      Consists of four non-standard residential buildings (4232 units) of 37 to 39 storeys high, with retail center, shops, NEC, EMO, DCCE, kindergarten and semi-underground car park. This project provides electrical and extra low voltage electrical systems for the above project.

....更多資料

Electrical and ELV Installation for URA Hai Tan Street/Kweilin Street and Pei Ho Street Development at NKIL6506, Sham Shui Po, Kowloon
(2017-2020)

  • Project

    Electrical and ELV Installation for URA Hai Tan Street/Kweilin Street and Pei Ho Street Development at NKIL6506, Sham Shui Po, Kowloon
    (2017-2020)

    Client

    Cheung Kong Holdings

    Construction Period

    2017-2020

  • Scope of Works

      The project covers 3 sites (Site A, Site B & Site C), and it is planned to build 4 residential buildings with 29 to 36 storeys and podiums, providing a total of 877 residential units. This project provides the installation of electrical and extra-low voltage electrical systems for the above project.

....更多資料

Electrical and Extra Low Votlage Installation for the Residential Development at No. 500, Kwun Chui Road, Tuen Mun, New Territories
(2018-2020)

  • Project

    Electrical and Extra Low Votlage Installation for the Residential Development at No. 500, Kwun Chui Road, Tuen Mun, New Territories
    (2018-2020)

    Client

    Evergrande Group

    Construction Period

    2018-2020

  • Scope of Works

      The project plans to build 4 residential buildings with a height of 20 floors, together with 22 detached houses and a clubhouse, providing a total of 1947 residential units. This project provides the installation of electrical and extra-low voltage electrical systems for the above projects.

....更多資料

HVAC Installation for Tower and Podium NDSC for the Proposed Residential Development at Tai po Town Lot No. 221, Shan Tong Road, Lai Chi Shan, Tai Po, N.T.)
(2017-2020)

  • Project

    HVAC Installation for Tower and Podium NDSC for the Proposed Residential Development at Tai po Town Lot No. 221, Shan Tong Road, Lai Chi Shan, Tai Po, N.T.
    (2017-2020)

    Client

    China Overseas Land & Investment Ltd.

    Construction Period

    2017-2020

  • Scope of Works

      The project mainly includes 17 residential buildings with 10 to 19 floors, including clubhouse and parking lot, supply and installation of electrical, ultra-low voltage electrical, ventilation and split machine equipment.

....更多資料

Electrical Installation for Construction of Public Rental Housing Development at Fo Tan (In Sha Tin Areas 16 & 58D) Phases 1 and 2 (Nominated Sub-Contract)
(2016-2019)

  • Project

    Electrical Installation for Construction of Public Rental Housing Development at Fo Tan (In Sha Tin Areas 16 & 58D) Phases 1 and 2 (Nominated Sub-Contract)
    (2016-2019)

    Client

    Hong Kong Housing Authority

    Construction Period

    2016-2019

  • Scope of Works

      Supply and install electrical and extra low voltage electrical for 5 residential buildings with 34 to 39 floors, including commercial and parking lots.

....更多資料

Proposed Residential Development at Shek Kok Road, Tseung Kwan O, TKOTL No. 111, Area 85 (Site B) (ECA Installation Direct Contract)
(2013-2015)

  • Project

    Proposed Residential Development at Shek Kok Road, Tseung Kwan O, TKOTL No. 111, Area 85 (Site B) (ECA Installation Direct Contract)
    (2013-2015)

    Client

    Cheung Kong Holdings

    Construction Period

    2013-2015

  • Scope of Works

      The project mainly consists of three residential buildings, with a total of 872 residential units on the 36th floor of blocks 1 and 2 and the 37th floor of block 3, including the parking lot and club on the third floor, and the supply and installation of electrical, ultra-low voltage electrical, ventilation and split machine equipment. The floor area is about 10200 square meters and the total construction area is about 81500 square meters.

....更多資料

Mechanical & Electrical Installatoin for Proposed Hotel Development at Tung Chung Town Lot No. 38, Lantau Island, Hong Kong
(2017-2019)

  • Project

    Mechanical & Electrical Installatoin for Proposed Hotel Development at Tung Chung Town Lot No. 38, Lantau Island, Hong Kong
    (2017-2019)

    Client

    Shimao Property Holdings Limited

    Construction Period

    (2017-2019

  • Scope of Works

      The project provides electrical and low-voltage power, fire service and air conditioning system for three 13-15 storey hotel buildings, 3-4 storey platforms and basement.

....更多資料

Proposed MGM Cotai Project, MGM Grand Paradise
(2014-2016)

  • Project

    Proposed MGM Cotai Project, MGM Grand Paradise
    (2014-2016)

    Client

    MGM Grand Paradise Ltd)

    Construction Period

    2014-2016

  • Scope of Works

      The development consists 5-star hotel, service suites and podium including hotel ballrooms, casino, dining areas,  retail shopsand basement.

      The supply and installation of Building Services for the development consists:
      1.Electrical Services with HV & LV Switch Boards, Transformer, Ring Main Unit, and LV electrical distribution system.
      2.MVAC System with Chiller, Cooling Tower, Heat Pump, Water Pump. AHU, Fans, Boiler, Heat Exchanger, and etc.
      3.PD System with Calorifier, UV Sterilizer, Filters, Reverse Osmosis, Water Pumps, and etc.
      4.FS System with Fire pump, Sprinkler pump, Drencher pump etc.
      5.HV Generator Sets & Dynamic Rotary UPS.

....更多資料

"Studio City Macau, NSC Works for Tower A&B MEP Services"
(2012-2015)

  • Project

    "Studio City Macau, NSC Works for Tower A&B MEP Services"
    (2012-2015)

    Client

    Studio City Development Limited

    Construction Period

    2012-2015

  • Scope of Works

      Provided and installed electrical, air-conditioning, firefighting, water supply and drainage works for a hotel project with a total of 84 floors, including 1,660 luxury suites.

....更多資料

Hong Kong Disney Resort Project - GC7 Fantasyland
(2003-2005)

  • Project

    Hong Kong Disney Resort Project - GC7 Fantasyland
    (2003-2005)

    Client

    Hongkong International Theme Parks Limited

    Construction Period

    2003-2005

  • Scope of Works

      The supply and Installation of Electrical Wervices consists:
      Electrical supply system to the ride / audio / show system, restaurants and kitchens inside the park.
      General lighting system and dimming system for lighting effect for show.
      Cable containments and interface work to serve the audio, parkwide, ride, show control and miscellaneous systems.

....更多資料

Mechanical & Electrical Installatoin for Wynn Resorts Macau
(2004-2005)

  • Project

    Mechanical & Electrical Installatoin for Wynn Resorts Macau
    (2004-2005)

    Client

    Wynn Resorts (Macau) S.A.

    Construction Period

    2004-2005

  • Scope of Works

      Supply and installation of high voltage and low voltage electrical equipment works, including backup generator and low voltage switch cabinet.

....更多資料