Page 10 - InSpires Vol.6 - CSHK
P. 10
FOCUS STORY 焦點故事 The Company is responsible for the design, construction and operation of the project. In the “Carbon Neutral Commitment during the Construction Period of O·PARK2” released earlier, the Company has committed to achieve carbon neutrality during the construction period and to disclose the results and research information annually to set an example of low carbon transformation in the construction industry. The project is designed in accordance with the BEAM Plus V1.2 Platinum, the highest requirement of the Hong Kong Green Building Council (HKGBC), and adopts innovative construction technologies such as BIM 7D, MiC and DfMA to reduce consumables. In addition, data and information are collected through our self-developed Carbon Neutral Cloud Platform in the system for subsequent analysis and statistics to lay the foundation for carbon asset trading and management. We estimate that an overall carbon reduction of 3,198 tonnes of carbon dioxide equivalent will 10 China State Construction Engineering (Hong Kong) Limited | InSpires 06 In addition, CSHK has set up carbon neutral and carbon asset development committee and working group to formulate the overall strategy and oversee the operation of the project, with a view to reducing carbon emissions throughout the life cycle of the building from design, material selection, project construction to operation and maintenance, and achieving carbon neutral construction. By using Organic Resources Recovery Centre, Phase 2 (O-PARK2) as the first carbon neutral construction pilot project, the company has also commenced carbon neutral construction planning for the Chinese Medicine Hospital and the Government Chinese Medicines Testing Institute project as our first step. 此外,中建香港早前更成立了碳中和及碳資產開發 委員會及工作組,負責制訂整體策略和監督運作,配 合碳中和路線圖的制訂,從設計、 選料、項目建造、運營保養等 方面全面降低建築物生命週 期的碳排放,實現碳中和 施工。 公司以有機資源回收中心 第 二 期( O · P A R K 2 )作 為 首 個碳中和施工試點項目,並 開展中醫醫院及政府中藥檢 測中心工程項目的碳中和施工 規劃作為整體推進的第一步。 Organic Resources Recovery Centre Phase 有機資源回收中心第二期(O·PARK2)

