Page 18 - InSpires Vol.6 - CSHK
P. 18

 PROJECT AT A GLANCE 項目巡禮 18 China State Construction Engineering (Hong Kong) Limited | InSpires 06  Structural Safety Real Time Monitoring System     實時結構安全監控系統 The project requires an erection of a 30 meter high aluminum scaffold around the Buddha, which is used as a safety working platform and must not contact the surface of the Buddha. As the Buddha is located in a windy outdoor area, a displacement monitoring system, which is designed and used with a deformation monitoring device and a subsidence monitoring system as a whole, is equipped at the top of the aluminium scaffold to monitor the real-time structural safety, so that the scaffold’s stability and the supporting structure’s safety can be confirmed. If the data exceeds the limit allowed, the system will trigger alarms and the engineers can take appropriate action immediately. 此項工程需要圍繞大佛搭建一個高 30米的鋁架棚作為安全工作平台且架 不可接觸大佛表面。由於大佛位處風力 較強的戶外環境,鋁架頂部需要安裝位 移監控系統,配以變形監測及沉降監 控,用於實時監測結構安全,以確保鋁 架的穩定性及支撐結構的安全性。若 讀取數據超過設定預限,系統會發出 警報,讓工程師即時作出相應措施。      


































































































   16   17   18   19   20